2012 ◽  
Vol 45 ◽  
pp. 101-105
Author(s):  
Huang Wenhong ◽  
Hailong Wang ◽  
Xuesheng Li ◽  
Qifu Bao

2020 ◽  
Vol 2020 ◽  
pp. 1-9
Author(s):  
Jiao Wang

Based on the perspective of cost risk management of the entire process of power grid construction project, the WBS-RBS risk identification method is applied. The risk factors of power grid engineering cost are comprehensively identified from the five major engineering cost formation stages: investment decision estimate stage, design estimate stage, bidding price stage, construction budget stage, and final account stage. Combined with the basic data obtained from the questionnaire, the membership degree method is adopted to screen the key indicators of the preliminary factors of cost risk and then eliminate the redundant indicators. Furthermore, a set of simple and efficient risk evaluation index system for power grid engineering cost is constructed in order to improve the risk evaluation and management level of power grid construction project in China.


2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Baorui Liang ◽  
Suhua Zhang ◽  
Dongping Li ◽  
Yuxin Zhai ◽  
Fei Wang ◽  
...  

Due to the high risk of construction sites, it is necessary to make safety risk evaluation. With the synthetic consideration of the complexity and uncertainty of construction sites, a comprehensive evaluation index system with two levels has been based on the emphases and difficulties of the current safety work in construction industry; the index system includes civilized construction site, management of machinery, equipment, materials, occupation health protection, and the subpackage management, such as 6 one-level evaluation indexes, inspection system of safety risk, safety awareness education, and prevention and control of occupation disease, such as 33 two-level evaluation indexes. The research takes “No. A residential building and other 8 projects” as the empirical analysis object, with the weights of the first indexes and second indexes being calculated by the analytic hierarchy process (AHP) and the information entropy, and applies the unascertained measure to comprehensively evaluate the safety risk of the construction project. The overall score of the project is 6.4475, the evaluation result is good, which is consistent with the actual situation, and the feasibility and effectiveness of the evaluation index system and evaluation model are verified, which provides a reference for safety risk management in the construction stage of construction projects.


2021 ◽  
Vol 3 (2) ◽  
pp. 20-24
Author(s):  
Jie Ji ◽  
Rongli Zhou

The evaluation of science and technology achievements is directly related to its transformation, and the construction of a third-party evaluation index system for its achievements is an important prerequisite for its evaluation. The third party refers to a service organization with high business capabilities and evaluation qualifications, which is relatively more objective, independent and fair. The authors explore and analyzes the problems existing in the evaluation of science and technology achievements, and puts forward an effective strategy for the construction of a third-party evaluation index system for science and technology achievements, hoping to help the smooth development of its third-party evaluation.


Sign in / Sign up

Export Citation Format

Share Document