Prediction of the Penetration Rate and Number of Consumed Disc Cutters of Tunnel Boring Machines (TBMs) Using Artificial Neural Network (ANN) and Support Vector Machine (SVM)—Case Study: Beheshtabad Water Conveyance Tunnel in Iran
2019 ◽
Vol 16
(1)
◽
pp. 49-57
◽
Keyword(s):
2011 ◽
Vol 6
(2)
◽
pp. 481-489
◽
Keyword(s):
1984 ◽
Vol 21
(6)
◽
pp. 232
Keyword(s):
Keyword(s):
2019 ◽
Vol 78
(8)
◽
pp. 6347-6360
◽
Keyword(s):
2019 ◽
Vol 90
◽
pp. 249-263
◽
Keyword(s):
2014 ◽
Vol 8
(7)
◽
pp. 4833-4842
◽
2017 ◽
Vol 137
(1)
◽
pp. 114-119
Keyword(s):
Keyword(s):