scholarly journals Causes of Project Delay in the Construction Industry in Afghanistan

Author(s):  
Ghulam Abbas Niazai ◽  
Kassim Gidado
2015 ◽  
Vol 76 (2) ◽  
Author(s):  
Mohd Nur Asmawisham Alel ◽  
Rosli Saad ◽  
Rini Asnida Abdullah ◽  
Liew Inn Wei

This paper presents the applicability of Electrical Resistivity Tomography (ERT) in Subsurface Utilities Engineering (SUE). The objective is to use pseudosection generated by ERT to located known subsurface utilities. For construction industry, the investigation of subsurface utility is essential to avoid unforeseen condition that may cause project delay. According to the result, performing ERT using fundamental tester in this study is not suitable to locate subsurface utilities, however it can locate the loose part of the ground which likely to indicate the location of subsurface utilities. Therefore, ERT exhibits potential to be used before the actual subsurface utilities mapping to simplify the work of gathering information to locate the subsurface utilities accurately.


2018 ◽  
Vol 2 (6) ◽  
pp. 1-10
Author(s):  
Zaina Ahmed Hameed ◽  

The purpose of the research is to identify the factors that contributes to cost escalation and delay of PPP construction projects in Maldives and to identify the significant factors in the perspective of the actors (client, contractor and consultant). In this quantitative research, a survey comprising the actors who have had previous experience in the field of PPP construction projects were used. The data analysis was carried out using Relative and Important Index (RII). The key findings indicate that the most significant factor for cost escalation is scope changes, followed by schedule delay and technical challenges and the most significant factor for project delay was delayed payments, followed by financial process, changes in drawings and poor supervision. The study contributes to the body of knowledge in construction industry by identifying the most significant factor which contributes to cost escalation and project delay in Maldives. The study is particularly useful for policymakers as a guide for planning and implementing PPP projects in the construction industry of Maldives.


2017 ◽  
Author(s):  
Hannah M. Curtis ◽  
Hendrika Meischke ◽  
Nancy Simcox ◽  
Sarah Laslett ◽  
Noah Seixas

Author(s):  
Kambiz Rasoulkhani ◽  
Abdullah Alsharef ◽  
Siddharth Banerjee ◽  
Sudipta Chowdhury ◽  
Qingchun Li ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document