199. Risk Assessment: A Tool in Health & Safety Management System Decision Making

2002 ◽  
Author(s):  
M. O'Brien
2018 ◽  
Vol 31 ◽  
pp. 12006 ◽  
Author(s):  
Lisa Rolita ◽  
Bayu Surarso ◽  
Rahmat Gernowo

In order to improve airport safety management system (SMS) performance, an evaluation system is required to improve on current shortcomings and maximize safety. This study suggests the integration of the DEMATEL and ANP methods in decision making processes by analyzing causal relations between the relevant criteria and taking effective analysis-based decision. The DEMATEL method builds on the ANP method in identifying the interdependencies between criteria. The input data consists of questionnaire data obtained online and then stored in an online database. Furthermore, the questionnaire data is processed using DEMATEL and ANP methods to obtain the results of determining the relationship between criteria and criteria that need to be evaluated. The study cases on this evaluation system were Adi Sutjipto International Airport, Yogyakarta (JOG); Ahmad Yani International Airport, Semarang (SRG); and Adi Sumarmo International Airport, Surakarta (SOC). The integration grades SMS performance criterion weights in a descending order as follow: safety and destination policy, safety risk management, healthcare, and safety awareness. Sturges' formula classified the results into nine grades. JOG and SMG airports were in grade 8, while SOG airport was in grade 7.


1998 ◽  
Author(s):  
Abdul Halim Hamid ◽  
Cut Ahmad Zainy ◽  
Joko Purwanto ◽  
Agustanzil Syahroezah

2018 ◽  
Vol 7 (3) ◽  
pp. 54-70 ◽  
Author(s):  
Allen Wan ◽  
Sam Zulu ◽  
Fazard Khosrowshahi

Given sizable capital projects in Hong Kong are using BIM from January 2018 on and site safety continues to be a concern for the local construction stakeholders. It is timely to investigate the potential of using BIM for construction safety. This research reveals the potential of using BIM for site safety is strong (85% supported), indicating Hong Kong should engage specific projects to test effectiveness of using BIM for safety, including implementation of safety management system and/or process of risk assessment.


Sign in / Sign up

Export Citation Format

Share Document