scholarly journals Triple the Gamma—A Unifying Shrinkage Prior for Variance and Variable Selection in Sparse State Space and TVP Models

Econometrics ◽  
2020 ◽  
Vol 8 (2) ◽  
pp. 20
Author(s):  
Annalisa Cadonna ◽  
Sylvia Frühwirth-Schnatter ◽  
Peter Knaus

Time-varying parameter (TVP) models are very flexible in capturing gradual changes in the effect of explanatory variables on the outcome variable. However, in particular when the number of explanatory variables is large, there is a known risk of overfitting and poor predictive performance, since the effect of some explanatory variables is constant over time. We propose a new prior for variance shrinkage in TVP models, called triple gamma. The triple gamma prior encompasses a number of priors that have been suggested previously, such as the Bayesian Lasso, the double gamma prior and the Horseshoe prior. We present the desirable properties of such a prior and its relationship to Bayesian Model Averaging for variance selection. The features of the triple gamma prior are then illustrated in the context of time varying parameter vector autoregressive models, both for simulated dataset and for a series of macroeconomics variables in the Euro Area.

2016 ◽  
Vol 5 (3) ◽  
pp. 117
Author(s):  
I PUTU GEDE DIAN GERRY SUWEDAYANA ◽  
I WAYAN SUMARJAYA ◽  
NI LUH PUTU SUCIPTAWATI

The purpose of this research is to forecast the number of Australian tourists arrival to Bali using Time Varying Parameter (TVP) model based on inflation of Indonesia and exchange rate AUD to IDR from January 2010 – December 2015 as explanatory variables. TVP model is specified in a state space model and estimated by Kalman filter algorithm. The result shows that the TVP model can be used to forecast the number of Australian tourists arrival to Bali because it satisfied the assumption that the residuals are distributed normally and the residuals in the measurement and transition equations are not correlated. The estimated TVP model is . This model has a value of mean absolute percentage error (MAPE) is equal to dan root mean square percentage error (RMSPE) is equal to . The number of Australian tourists arrival to Bali for the next five periods is predicted: ; ; ; ; and (January - May 2016).


2010 ◽  
Vol 29 (1-2) ◽  
pp. 251-269 ◽  
Author(s):  
Lennart Hoogerheide ◽  
Richard Kleijn ◽  
Francesco Ravazzolo ◽  
Herman K. Van Dijk ◽  
Marno Verbeek

2019 ◽  
Vol 220 (2) ◽  
pp. 1368-1378
Author(s):  
M Bertin ◽  
S Marin ◽  
C Millet ◽  
C Berge-Thierry

SUMMARY In low-seismicity areas such as Europe, seismic records do not cover the whole range of variable configurations required for seismic hazard analysis. Usually, a set of empirical models established in such context (the Mediterranean Basin, northeast U.S.A., Japan, etc.) is considered through a logic-tree-based selection process. This approach is mainly based on the scientist’s expertise and ignores the uncertainty in model selection. One important and potential consequence of neglecting model uncertainty is that we assign more precision to our inference than what is warranted by the data, and this leads to overly confident decisions and precision. In this paper, we investigate the Bayesian model averaging (BMA) approach, using nine ground-motion prediction equations (GMPEs) issued from several databases. The BMA method has become an important tool to deal with model uncertainty, especially in empirical settings with large number of potential models and relatively limited number of observations. Two numerical techniques, based on the Markov chain Monte Carlo method and the maximum likelihood estimation approach, for implementing BMA are presented and applied together with around 1000 records issued from the RESORCE-2013 database. In the example considered, it is shown that BMA provides both a hierarchy of GMPEs and an improved out-of-sample predictive performance.


2019 ◽  
Vol 2 (2) ◽  
pp. 258-276
Author(s):  
Nan Li ◽  
Liu Yuanchun

Purpose The purpose of this paper is to summarize different methods of constructing the financial conditions index (FCI) and analyze current studies on constructing FCI for China. Due to shifts of China’s financial mechanisms in the post-crisis era, conventional ways of FCI construction have their limitations. Design/methodology/approach The paper suggests improvements in two aspects, i.e. using time-varying weights and introducing non-financial variables. In the empirical study, the author first develops an FCI with fixed weights for comparison, constructs a post-crisis FCI based on time-varying parameter vector autoregressive model and finally examines the FCI with time-varying weights concerning its explanatory and predictive power for inflation. Findings Results suggest that the FCI with time-varying weights performs better than one with fixed weights and the former better reflects China’s financial conditions. Furthermore, introduction of credit availability improves the FCI. Originality/value FCI constructed in this paper goes ahead of inflation by about 11 months, and it has strong explanatory and predictive power for inflation. Constructing an appropriate FCI is important for improving the effectiveness and predictive power of the post-crisis monetary policy and foe achieving both economic and financial stability.


Author(s):  
Giuseppe De Luca ◽  
Jan R. Magnus

In this article, we describe the estimation of linear regression models with uncertainty about the choice of the explanatory variables. We introduce the Stata commands bma and wals, which implement, respectively, the exact Bayesian model-averaging estimator and the weighted-average least-squares estimator developed by Magnus, Powell, and Prüfer (2010, Journal of Econometrics 154: 139–153). Unlike standard pretest estimators that are based on some preliminary diagnostic test, these model-averaging estimators provide a coherent way of making inference on the regression parameters of interest by taking into account the uncertainty due to both the estimation and the model selection steps. Special emphasis is given to several practical issues that users are likely to face in applied work: equivariance to certain transformations of the explanatory variables, stability, accuracy, computing speed, and out-of-memory problems. Performances of our bma and wals commands are illustrated using simulated data and empirical applications from the literature on model-averaging estimation.


Sign in / Sign up

Export Citation Format

Share Document