scholarly journals Monte Carlo Simulation of the Moments of a Copula-Dependent Risk Process with Weibull Interwaiting Time

Risks ◽  
2021 ◽  
Vol 9 (6) ◽  
pp. 109
Author(s):  
Sharifah Farah Syed Yusoff Alhabshi ◽  
Zamira Hasanah Zamzuri ◽  
Siti Norafidah Mohd Ramli

The widely used Poisson count process in insurance claims modeling is no longer valid if the claims occurrences exhibit dispersion. In this paper, we consider the aggregate discounted claims of an insurance risk portfolio under Weibull counting process to allow for dispersed datasets. A copula is used to define the dependence structure between the interwaiting time and its subsequent claims amount. We use a Monte Carlo simulation to compute the higher-order moments of the risk portfolio, the premiums and the value-at-risk based on the New Zealand catastrophe historical data. The simulation outcomes under the negative dependence parameter θ, shows the highest value of moments when claims experience exhibit overdispersion. Conversely, the underdispersed scenario yields the highest value of moments when θ is positive. These results lead to higher premiums being charged and more capital requirements to be set aside to cope with unfavorable events borne by the insurers.

Author(s):  
WAYAN ARTHINI ◽  
KOMANG DHARMAWAN ◽  
LUH PUTU IDA HARINI

Value at Risk (VaR) is the maximum potential loss on a portfolio based on the probability at a certain time.  In this research, portfolio VaR values calculated from historical data and Monte Carlo simulation data. Historical data is processed so as to obtain stock returns, variance, correlation coefficient, and variance-covariance matrix, then the method of Markowitz sought proportion of each stock fund, and portfolio risk and return portfolio. The data was then simulated by Monte Carlo simulation, Exact Monte Carlo Simulation and Expected Monte Carlo Simulation. Exact Monte Carlo simulation have same returns and standard deviation  with historical data, while the Expected Monte Carlo Simulation satistic calculation similar to historical data. The results of this research is the portfolio VaR  with time horizon T=1, T=10, T=22 and the confidence level of 95 %, values obtained VaR between historical data and Monte Carlo simulation data with the method exact and expected. Value of VaR from both Monte Carlo simulation is greater than VaR historical data.


2015 ◽  
Vol 4 (1and2) ◽  
pp. 28
Author(s):  
Marcelo Brutti Righi ◽  
Paulo Sergio Ceretta

We investigate whether there can exist an optimal estimation window for financial risk measures. Accordingly, we propose a procedure that achieves optimal estimation window by minimizing estimation bias. Using results from a Monte Carlo simulation for Value at Risk and Expected Shortfall in distinct scenarios, we conclude that the optimal length for the estimation window is not random but has very clear patterns. Our findings can contribute to the literature, as studies have typically neglected the estimation window choice or relied on arbitrary choices.


2016 ◽  
Vol 8 (1) ◽  
pp. 62
Author(s):  
Atikah Aghdhi Pratiwi ◽  
Rosa Rilantiana

AbstractBasically, the purpose of a company is make a profit and enrich the owners of the company. This is manifested by development and achievement of good performance, both in financial and operational perspective. But in reality, not all of companies can achieve good performance. One of them is because exposure of risk. This could threaten achievement of the objectives and existence of the company. Therefore, companies need to have an idea related to possible condition and financial projection in future periods that are affected by risk. One of the possible method is Monte Carlo Simulation. Research will be conducted at PT. Phase Delta Control with historical data related to production/sales volume, cost of production and selling price. Historical data will be used as Monte Carlo Simulation with random numbers that describe probability of each risk variables describing reality. The main result is estimated profitability of PT. Phase Delta Control in given period. Profit estimation will be uncertain variable due to some uncertainty


Algorithms ◽  
2020 ◽  
Vol 13 (12) ◽  
pp. 325
Author(s):  
Emad Mohamed ◽  
Parinaz Jafari ◽  
Simaan AbouRizk

Currently, input modeling for Monte Carlo simulation (MSC) is performed either by fitting a probability distribution to historical data or using expert elicitation methods when historical data are limited. These approaches, however, are not suitable for wind farm construction, where—although lacking in historical data—large amounts of subjective knowledge describing the impacts of risk factors are available. Existing approaches are also limited by their inability to consider a risk factor’s impact on cost and schedule as dependent. This paper is proposing a methodology to enhance input modeling in Monte Carlo risk assessment of wind farm projects based on fuzzy set theory and multivariate modeling. In the proposed method, subjective expert knowledge is quantified using fuzzy logic and is used to determine the parameters of a marginal generalized Beta distribution. Then, the correlation between the cost and schedule impact is determined and fit jointly into a bivariate distribution using copulas. To evaluate the feasibility of the proposed methodology and to demonstrate its main features, the method was applied to an illustrative case study, and sensitivity analysis and face validation were used to evaluate the method. The results demonstrated that the proposed approach provides a reliable method for enhancing input modeling in Monte Carlo simulation (MCS).


Risks ◽  
2018 ◽  
Vol 6 (3) ◽  
pp. 88 ◽  
Author(s):  
Rui Fang ◽  
Xiaohu Li

Co-risk measures and risk contribution measures have been introduced to evaluate the degree of interaction between paired risks in actuarial risk management. This paper attempts to study the ordering behavior of measures on interaction between paired risks. For various co-risk measures and risk contribution measures, we investigate how the marginal distributions and the dependence structure impact on the level of interaction between paired risks. Also, several numerical examples based on Monte Carlo simulation are presented to illustrate the main findings.


Author(s):  
Tomasz Rymarczyk ◽  
Grzegorz Kłosowski

In this paper, the conceptual model of risk-based cost estimation for completing tasks within supply chain is presented. This model is a hybrid. Its main unit is based on Monte Carlo Simulation (MCS). Due to the fact that the important and difficult to evaluate input information is vector of risk-occur probabilities the use of artificial intelligence method was proposed. The model assumes the use of fuzzy logic or artificial neural networks – depending on the availability of historical data. The presented model could provide support to managers in making valuation decisions regarding various tasks in supply chain management.