Specification for information management for the capital/delivery phase of construction projects using building information modelling

2020 ◽  
Vol 312 ◽  
pp. 02002
Author(s):  
Abdul-Majeed Mahamadu ◽  
Lamine Mahdjoubi ◽  
Patrick Manu ◽  
Clinton Aigbavboa

With more than 80% of all construction projects overrunning their budget, there is a need for more efficient management of the estimated 10% of Gross Domestic Product (GDP) that is expended annually on construction across the world. It has been proposed that better information and data management through Building Information Modelling (BIM) will lead to cost savings and greater predictability. Notwithstanding the role of quantity surveyors (QS) in modelling and managing construction cost, they remain among the least capable of assimilating BIM into their existing traditional processes. Despite the increasing need for BIM capability assessments for projects, there remains, no tool specifically developed for assessing QS firm’s BIM utilisation capacity or performance. As a result, it is unclear the attributes that indicate BIM capability of QS firms as well as QS practices on projects. This study sought to address this through a review of BIM capability assessment frameworks in order to ascertain their suitability for QS practices. An expert focus group discussion was then used to identify peculiar attributes suitable for QS BIM capability assessment as a precursor to the development of a comprehensive model of QS BIM capability maturity. Findings reveal that most QS BIM capability attributes relate to processes including criteria for effective information definition and data management such that they are consistent with QS measurement standards. The BIM competence of staff also emerged as one of the key attributes highlighting the need for QSs to improve their knowledge, skills and experience in the application of BIM amidst current low levels of adoption. The proposed attributes would assist the development of performance and maturity indicators that would help QS firms better understand their own capability as well as the requirements for delivering costing services through BIM on projects.


MODUL ◽  
2019 ◽  
Vol 19 (1) ◽  
pp. 15
Author(s):  
Bangun IR Harsritanto ◽  
Gentina Pratama Putra ◽  
Rona Fika Jamila

Building information modelling (BIM) is a system that integrates multi-dimensional aspects of construction project at every phase. Simply said BIM unified all project databases from and to all stakeholders. This system still continuously developed and widely spread on each countries construction projects. In architecture, the BIM has been revolute the human resource requirements on the projects. Indonesia as developing country is still performing transitions from large worker project into more compact projects; from centralized projects into decentralized project. The BIM system has been a mandatory in several Indonesia big infrastructure projects to plan, simulate, design and deliver databases for making more quick decision making and improve the facilities. This paper aim is describing the benefit-challenge factors of BIM adoption on Indonesia architecture projects and the potential driving factors of BIM application. This study was qualitative paradigm with analysis method of selected literatures and previous research paper review which stratified by the cases. The results of this study are BIM bring the high efficiency and represent the complete skills for an architect. However the high initial cost of technology and human investment, the unsupported regulation and conventional system resistant challenged the Indonesia architecture society to adopt BIM. Furthermore the Indonesia architecture education is still struggling to learn and teach the BIM as an integral part in studio as the agent of change.


10.5772/58447 ◽  
2014 ◽  
Vol 11 (8) ◽  
pp. 124 ◽  
Author(s):  
Jian Li ◽  
Ying Wang ◽  
Xiangyu Wang ◽  
Hanbin Luo ◽  
Shih-Chung Kang ◽  
...  

2021 ◽  
Vol 19 (01) ◽  
pp. 180-197
Author(s):  
Vladimir Popov ◽  
Milena Medineckienė ◽  
Tatjana Grigorjeva ◽  
Arūnas Remigijus Zabulėnas

Traditional construction planning is being replaced by the building information modelling (BIM) approach, which seeks to digitalise all the construction procedures, including procurement. Successful implementation of BIM on the market requires the preparation of appropriate procurement documents. Purpose – to suggest the most suitable set of documents for public procurement in the context of BIM by analysing the documents that are necessary for implementing the stages of the building life cycle. Research methodology – in order to achieve the aim of the research, the in-depth analysis of different countries’ procurement methodological documents and analysis of the scientific articles have been implemented. The methodology also includes expert interviewing, which was done in order to analyse the investigated standards. Findings – After analysing the procurement procedures of Norway, Spain, France, Poland, the United Kingdom, the Netherlands, and Finland, a set of documents, including Employer’s Information Requirements (EIR), BIM Execution Plan (BEP) and BIM protocol, was considered as the most suitable for BIM-based procurement processes. In addition, the basic principles of ISO 19650-2:2018 do not reflect the specific conditions of each country, so it is appropriate to examine the possibility of providing guidance in individual national annexes that reflects the peculiarities of national procurement. Research limitations – some research limitations were related to the challenges to access the literature, particularly the regulatory documentation associated with the public procurement procedure in a singular Country. Also, the difficulties with and accessing the document in the English language. However, in most of these cases, the document overview was analysed or translated from the native language. Originality/Value – existing related studies are mainly oriented on a particular region/country, and no general overview of European countries regarding BIM procurement procedures has been implemented. Additionally, a significant scientific contribution of this research is the review of the fundamental standards, which includes the general specification for information management in construction projects using BIM. Implemented analysis can serve as a basis for other authors to implement their research concerning their region, to suggest the most appropriate and suitable set of documents. Practical implications – this study contributes to the preparation of the Lithuanian market for the implementation of BIM and could help policy-makers to prepare the most appropriate procurement documents.


2014 ◽  
Vol 75 (1) ◽  
Author(s):  
Zahrizan Zakari ◽  
Nasly Mohamed Ali Ali ◽  
Ahmad Tarmizi Haron ◽  
Amanda Marshall Ponting ◽  
Zuhairi Abd. Hamid

In Malaysia, Building Information Modelling (BIM) has recently gained attraction from construction players and some of them have applied it to several projects. By utilising the BIM process, the construction players have the opportunity to plan, coordinate and design in an integrated approach. This is one of the many benefits that they could gain and resulting in increased productivity. Despite these benefits, the implementation of BIM in the Malaysian construction industry is still lagging behind Singapore, for instance. Thus, it warrants a study such as the present to determine what are the actual barriers that hamper its implementation and what are the driving factors that could enhance its pace of implementation in the Malaysian construction industry. In this study, a questionnaire survey based on Convenience Sampling Method was carried out to gather the possible barriers and driving factors for BIM implementation among the Malaysian construction players. Additionally, Relative Importance Indices (RII) were used to analyse the data obtained and to identify those barriers and driving factors for the implementation of BIM in this country. Consequently, results of this study revealed that the main barriers for implementing the BIM are: 1) Lack of knowledge about BIM, 2) Reluctance and/or no insistence shown by the Malaysian construction industry players (Clients, Contractors and Consultants alike) on the use or implementation of BIM. The driving factors, on the other hand, that could lead to the speeding up of the implementation of BIM are: 1) Support and enforcing the implementation of BIM by the Government, 2) promote BIM training program and 3) Initiatives of senior management of the related industry players. In conclusion, for successful wide spread application of BIM in Malaysia, a good push from the government alone is far from enough. All other construction industry players mentioned must assume their roles well in promoting the use of BIM in their construction projects.