Application Research on the Critical Chain Technology in Engineering Project Schedule Management

2013 ◽  
Vol 12 (17) ◽  
pp. 4196-4199
Author(s):  
Ai-lin Zhang ◽  
Li-xia Wang
2019 ◽  
Vol 11 (24) ◽  
pp. 7229
Author(s):  
Guofeng Ma ◽  
Jianyao Jia ◽  
Tiancheng Zhu ◽  
Shan Jiang

In order to overcome the difficulty in quantifying rework by traditional project schedule management tools, this study proposes an innovative method, namely improved Critical Chain Design Structure Matrix (ICCDSM). From the perspective of information flow, the authors firstly make assumptions on activity parameters and interactions between activities. After that, a genetic algorithm is employed to reorder the activity sequence, and a banding algorithm with consideration of resource constraints is used to identify concurrent activities. Then potential criticality is proposed to measure the importance of each activity, and the rework impact area is implicated to indicate potential rework windows. Next, two methods for calculating project buffer are employed. A simulation methodology is used to verify the proposed method. The simulation results illustrate that the ICCDSM method is capable of quantifying and visualizing rework and its impact, decreases iterations, and improves the completion probability. In this vein, this study provides a novel framework for rework management, which offers some insights for researchers and managers.


2013 ◽  
Vol 438-439 ◽  
pp. 1777-1781 ◽  
Author(s):  
Jun Yan Jin

Schedule control is one of the main tasks of engineering project management, and effective schedule management is an important means of realization of project objectives. The traditional project schedule management is lack of dynamic adjustment and update, and various drawbacks of the method have been appeared. Last planner system (LPS) is a kind of schedule management of project based TFV theory of lean thinking, which transfers the traditional "push" system into "pull" system for schedule management. Based on the master schedule, look-ahead schedule and weekly work plan, schedule management with LPS will facilitate the realization the projects schedule objective.


2013 ◽  
Vol 791-793 ◽  
pp. 1423-1426
Author(s):  
Hai Min Wei ◽  
Rong Guang Liu

Project schedule management is the management to each stage of the degree of progress and project final deadline in the project implementation process. Its purpose is to ensure that the project can meet the time constraints under the premise of achieving its overall objectives.When the progress of schedule found deviation in the process of schedule management ,the progress of the plan which have be advanced previously need to adjust.This article mainly discussed to solve the following two questions:establish the schedule optimization model by using the method of linear;discuss the particle swarm optimization (PSO) algorithm and its parameters which have effect on the algorithm:Particle swarm optimization (PSO) algorithm is presented in the time limited project and the application of a cost optimization.