Implementation of the technology of chromate desorption systems to optimize the position of the well relative to the contact boundaries in the development of oil rims
Keyword(s):
1986 ◽
Vol 24
(3)
◽
pp. 491-500
◽
Keyword(s):
2008 ◽
Vol 49
(4)
◽
pp. 587-600
◽
2012 ◽
Vol 19
(1-3)
◽
pp. 144-168
◽
2008 ◽
Vol 44
(14)
◽
pp. 862-871
◽
Keyword(s):