BicriteriaHeuristic for Unrelated Parallel Machine Scheduling Problem
2014 ◽
Vol 1016
◽
pp. 824-828
Keyword(s):
In this research, a bi-criteria heuristic is proposed to find non-dominated solutions for scheduling unrelated parallel machines with release dates that minimizes makespan andtotal weighted tardiness.
2019 ◽
Vol 58
(22)
◽
pp. 6826-6845
◽
2016 ◽
pp. 308-319
◽
2014 ◽
Vol 302
◽
pp. 53-72
◽
2007 ◽
Vol 58
(3)
◽
pp. 346-354
◽