Power Distribution System Evaluation in Chemical Industry Park Using Subjective and Objective Comprehensive Weight Method
The plan for power supply and distribution system in the Chemical Industry Park is complex. The evaluation method must be easy and truly show the site conditions in order to maintain the proper function of the system. Thus the fuzzy comprehensive evaluation method was chosen and applied in this paper. As for the weight calculation, Analytic hierarchy process (AHP) was used to compute the subjective weight; on the purpose of avoiding strong effect of subjective factors, the standard deviation for each index was calculated, and then the subjective weight was integrated to build the subjective and objective comprehensive weight model. Lastly fuzzy comprehensive evaluation method was applied into the model for assessing the power supply and distribution system in the Chemical Industry Park.