Aggregate Planning of Batch Plant Operations

Keyword(s):  
2012 ◽  
Vol 7 (1) ◽  
Author(s):  
Yanjin Liu ◽  
Giraldo Eugenio

Cultured bacteria addition is one of the technologies used for odor control and FOG (fat, oil, and grease) removal in wastewater collection systems. This study investigated the efficiency of bacterial addition on wastewater odor control by conducting a set of full scale trials in a 60,000 cubic meter per day system for a period of two years. The objectives of this study were: (i) to identify factors that could impact wastewater treatment plant (WWTP) operations due to the effect of bacterial addition in the collection system, (ii) to estimate/understand the level of those impacts, and (iii) to present some interesting findings from the completed case study. The plant operation data before and during the bacterial addition were reviewed. The application of the cultured bacteria presented in the study was found to have significant impacts on the operation of the WWTP in terms of influent biological oxygen demand (BOD) and total suspended solids (TSS) loading, primary settling, sludge production, energy use, dissolved sulfides concentration, and methane production.


2006 ◽  
Vol 33 (8) ◽  
pp. 1065-1074 ◽  
Author(s):  
Tarek M Zayed ◽  
Ibrahim A Nosair

Assessing productivity, cost, and delays are essential to manage any construction operation, particularly the concrete batch plant (CBP) operation. This paper focuses on assessing the above-mentioned items for the CBP using stochastic mathematical models. It aims at (i) identifying the potential sources of delay in the CBP operation; (ii) assessing their influence on production, efficiency, time, and cost; and (iii) determining each factor share in inflating the CBP concrete unit expense. Stochastic mathematical models were designed to accomplish the aforementioned objectives. Data were collected from five CBP sites in Indiana, USA, to implement and verify the designed models. Results show that delays due to management conditions have the highest probability of occurrence (0.43), expected value of delay percent (62.54% out of total delays), and relative delay percent. The expected value of efficiency for all plants is 86.53%; however, the average total expense is US$15.56/m3 (all currency are in US$). In addition, the expected value of effective expenses (EE) is $18.03/m3, resulting in extra expenses (XE) of $2.47/m3. This research is relevant to both industry practitioners and researchers. It develops models to determine the effect of delays on concrete unit cost. They are also beneficial to the CBP management.Key words: concrete batch plant, delays, management conditions, cost models, cost management, stochastic mathematical models.


Solar Energy ◽  
2021 ◽  
Vol 214 ◽  
pp. 551-564
Author(s):  
Linrui Ma ◽  
Tong Zhang ◽  
Xuelin Zhang ◽  
Bin Wang ◽  
Shengwei Mei ◽  
...  

Author(s):  
R.W. Pack ◽  
P.M. Lazar ◽  
R.V. Schmidt ◽  
C.D. Gaddy

1979 ◽  
Vol 101 (1) ◽  
pp. 17-22 ◽  
Author(s):  
K. Phillips

A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Network (DSN) Station at Goldstone, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germaine to scheduling are presented. A more detailed description of algorithms and of operational aspects of the model is planned for a later report.


2009 ◽  
Vol 2009 (13) ◽  
pp. 3713-3719 ◽  
Author(s):  
Medi Sinaki ◽  
Bhavani Yerrapotu ◽  
Steve Colby ◽  
Issayas Lemma

Sign in / Sign up

Export Citation Format

Share Document