Analysis of the Main Points of Construction Technology of Bored Pile by Rotary Excavation

2021 ◽  
2020 ◽  
Vol 165 ◽  
pp. 04047
Author(s):  
Jianping Wang

Dongjiang Lichuan Bridge in Dongguan City is a curved tower curved beam cable-stayed bridge with a main span of 138m and no back cable. The main pier cap is located on the bank slope of Dongguan Waterway on one side of Nandi Road. The cushion cap is dumbbell type, and the left and right cushion caps are connected by tie beams. In most areas, the top of rock stratum is above the bottom of bearing platform. The rock stratum within the buried depth of bearing platform is moderately to strongly weathered argillaceous siltstone. The geological conditions are complex and the construction is difficult. In line with the principles of speeding up the construction process and improving economic benefits, comprehensive analysis and weighing advantages and disadvantages, the main pier cap adopts a composite cofferdam of filling soil to build an island and combining bored pile rows and steel sheet piles. The construction task of bearing platform of main pier has been completed with high quality. Compared with other cushion cap construction methods, this construction method has the advantages of fast construction, high quality, simple safety, energy saving and environmental protection. This paper briefly introduces the design scheme of composite cofferdam, expounds in detail the operation steps of steel sheet pile construction and the problems needing attention in construction, and provides good reference experience for similar pile cap construction.


2012 ◽  
Vol 446-449 ◽  
pp. 2449-2452
Author(s):  
Dong Guo Li ◽  
Gui Mei Shi

A viaduct of the Qinglai expressway fourth contract was artificial excavated piles. The construction technical work was regarded as an example. The technical comparison were done between the artificial excavated pile and the bored pile on the pile foundation bearing capacity and the retaining wall effect . The artificial excavated pile replacing the bored pile was feasible, and the construction technology and the key problems of the artificial excavated piles were confirmed. The references were provided to the similar projects.


2014 ◽  
Vol 1065-1069 ◽  
pp. 687-690
Author(s):  
Mei Yan He

Currently, bored pile been widely applied in the current road and bridge construction, But its construction technology in complex geological case is still not perfect. In view of this, this paper carried out a high-speed Lakes viaduct extraordinary pile foundation construction project. For the analysis of the technical difficulties in the construction process, explore get the corresponding key construction technology, and it relates to the accident and its approach are summarized, study drew long pile construction technology Lakes geological conditions under soft silt and clay, solve the long holes bored pile into the lake silt soft clay under geological conditions, verticality control and other technical problems, can provide reference for similar projects.


2014 ◽  
Vol 1044-1045 ◽  
pp. 633-637 ◽  
Author(s):  
Xin Zhou ◽  
Guang Xiu Fang ◽  
Ping Zhang ◽  
Yuan Qing Leng

Combined with the Beijing Business Center (CBD) core district Z14 plots commercial finance project (hereinafter referred to as the "CBD project") foundation pit construction, introduces the deep foundation pit of bored pile reinforcement cage fabrication and erection construction technology. In the construction process, through the site set up a special steel processing and production platform, the localization of the flange and other measures to solve the steel reinforcement cage positioning and connection construction difficulties. Combining the engineering fact, detailed calculation process of lifting steel cage hanging position, lifting machinery and hoisting rigging selection, and through the ANSYS software of finite element analysis and put forward specific measures to ensure the quality of steel reinforcement cage.