scholarly journals Forty steps to compile the "School of Islamic Architecture" - (In search of a model for the comprehensive benefit of the teachings "Islamic Wisdom" in "Architecture")

2021 ◽  
Vol 9 (4) ◽  
pp. 0-0
Author(s):  
salman noghrekar ◽  
2007 ◽  
Vol 87 (1) ◽  
pp. 35-52 ◽  
Author(s):  
B. A. Baitanayev ◽  
Yu. A. Yolgin
Keyword(s):  

1980 ◽  
Vol 43 (2) ◽  
pp. 251-276 ◽  
Author(s):  
G. R. D. King

In studies of Islamic architecture dealing with the earliest periods, a natural emphasis has fallen on the mosques of the Holy Cities of Arabia, the Ḥaramayn, whenever the architecture of the Arabian Peninsula has been discussed. In later periods, extensions and restorations in the Ḥaram in Mecca and the Mosque of the Prophet in al-Madīna have likewise been discussed, but until recent times, little has been said of any other Arabian mosques. As far as mosques beyond the Ḥaramayn are concerned, this neglect has been caused largely by their inaccessibility; but as a result of the imbalance, students of Islamic architecture have been left to judge Arabia by the Prophet's Mosque, which was only truly Arabian at its foundation, and the Ḥaram and the Ka'ba, which were always unique in Islam in terms both of religion and of architecture. As for later extensions and restorations of either mosque, these tell more of the development of Islamic architectural style and taste beyond the Peninsula than of any Arabian religious architectural tradition.


1963 ◽  
Vol 18 (3) ◽  
pp. 45
Author(s):  
Oleg Grabar ◽  
John D. Hoag
Keyword(s):  

1992 ◽  
Vol 29 ◽  
pp. 226
Author(s):  
Caroline Williams ◽  
Doris Behrens-Abouseif
Keyword(s):  

2012 ◽  
Vol 268-270 ◽  
pp. 664-672
Author(s):  
Ya Ting Sun ◽  
Zhi Rong Mei ◽  
Jun Wei Zhang

The conventional mucking system of tunnel construction in China has a series of deficiencies and stubborn problems. Tunnel mucking technologies matched with different tunnel construction methods have been analyzed systematically and the continuous belt mucking methodology which is appropriated with drilling-blasting method was presented. The continuous belt mucking technology includes mucking scheme design and mucking equipment configuration. Compared with the conventional mucking methods, the comprehensive benefit can be fully demonstrated by the new continuous belt mucking system. On the other hand, the predominance on environmental protection of the continuous belt mucking technoloty matches up with the conservation policy. The technology would be widely applied in long tunnels and tunnels embedded in frozen ground and located in bitter cold plateau. The economic benifis and contribution to society of continuous belt mucking technology would be remarkable.


Sign in / Sign up

Export Citation Format

Share Document