scholarly journals The Coordinate Transformation of Digital Geological Map in accordance with the World Geodetic System (A Case Study of Chungju and Hwanggang-ri Sheets using ArcToolbox)

2015 ◽  
Vol 48 (6) ◽  
pp. 537-543 ◽  
Author(s):  
Hyun-Joo Oh
2011 ◽  
Author(s):  
Kenneth Scott Ogier ◽  
Ziad A. Haddad ◽  
Oswaldo M. Mayer Moreira ◽  
Flavio Dias de Moraes ◽  
Jonathan Shipley

2018 ◽  
Vol 3 (1) ◽  
Author(s):  
Eaed Mohamad Al-Momani

This study highlights the denominations used for currently dormant volcanoes, as well as the names used for some of them in the Hashemite Kingdom of Jordan as a case study. This study also explains the nature of these volcanoes natural phenomena playing a major role in most geological processes contributing in the formation and development of the earth crust. On the other hand, this study has focused on identifying and analyzing some currently dormant volcanoes sites and their extension to the surface. This study used computerized programs, such as the World Geodetic System (WGS84), as well as the (ERDASIMAGINE) system to determine the volcanic sites in order to collect and analyze data. It has reached a few findings and recommendations regarding the denomination of volcanoes, the population’s safety guarantee, the resources of such areas, as well preserving the country’s landmarks


2013 ◽  
Vol 748 ◽  
pp. 1208-1211
Author(s):  
Hasnida Ab-Samat ◽  
Ernnie Illyani Basri ◽  
Nurul Aida Harun ◽  
Siew Ching Wee ◽  
Shahrul Kamaruddin

Preventive maintenance (PM) is the basic policy in maintenance system and widely used in companies all over the world. However, its advantages are not always fully received by the company because it is not carried out according to prescribed planning and schedule. This is because of improper implementation of the PM that leads to the major problem of increasing number of machine downtime. One of the reasons for the problem is ineffective PM checklist used during the implementation. Therefore, the aim of this paper is to reduce the planned downtime for PM by analyzing and enhancing the PM checklist. This is to show the importance of having good PM checklist as it simplified technicians workload and can reduce machine downtime if conducted properly. Consequently, good PM checklist will show the performances of the technicians doing their tasks as well as the performances of the machines to be operated in good operational condition.


2011 ◽  
Vol 110-116 ◽  
pp. 4799-4807 ◽  
Author(s):  
Quynh Lam Ngoc Le ◽  
Ngoc Hien Do ◽  
Ki Chan Nam

The development of the Toyota Production System (TPS) based on principles of lean technology has especially impressed numerous manufacturers around the world. It attaches remarkable importance to reducing and then eliminating waste and focusing on added-value activities. Lean technology is growing in important and scope because they help companies become more competitive and streamlined at a time when competitive and cost reduction pressures have intensified. Accordingly, a studied furniture company intends to transform its shop floor first to lean system. It is really an interesting and practical case study, so this paper presents an implementation of lean technology in an in-plant manufacturing system through a systematic way, step by step. It could be considered as a reference of an implementation of the lean technology.


2020 ◽  
Vol 43 ◽  
Author(s):  
Michael Lifshitz ◽  
T. M. Luhrmann

Abstract Culture shapes our basic sensory experience of the world. This is particularly striking in the study of religion and psychosis, where we and others have shown that cultural context determines both the structure and content of hallucination-like events. The cultural shaping of hallucinations may provide a rich case-study for linking cultural learning with emerging prediction-based models of perception.


Sign in / Sign up

Export Citation Format

Share Document