Multi-objective Reservoir Operation by Using a Multiple Objective Programming Model

2016 ◽  
Vol 16 (4) ◽  
pp. 239-245
Author(s):  
In-Chan Chung ◽  
Sheung-Kown Kim ◽  
Jaehee Kim
2015 ◽  
Vol 72 (10) ◽  
pp. 1879-1888 ◽  
Author(s):  
Y. Li ◽  
W. Li ◽  
B. Wang ◽  
X. W. Liu ◽  
Y. L. Xie ◽  
...  

In recent years, Binhai New Area of Tianjin has been suffering severe water shortage due to climate change and industrial activities. Integrated and effective water resources management approaches are urgent for the sustainable development of industrial parks in Binhai New Area. However, uncertainties exist in many aspects of the water resources system and are inevitably problematic for water resources planning and policy-making. To address these uncertainties, an interval multiple-objective programming model was developed here to support the long-term planning of industrial water resources management in Binhai New Area, Tianjin, China. The model incorporated both multiple-objective programming and interval linear programming into a general programming framework. The developed model could handle the uncertainties and complexities of the water management system, and also allowed decision makers to adjust fuzzy objective control decision variables to satisfy multiple holistic and interactive objectives. The solutions are useful for planning adjustments of the existing water allocation patterns in Binhai New Area.


2021 ◽  
pp. 1-10
Author(s):  
Zhaoping Tang ◽  
Wenda Li ◽  
Shijun Yu ◽  
Jianping Sun

In the initial stage of emergency rescue for major railway emergencies, there may be insufficient emergency resources. In order to ensure that all the emergency demand points can be effectively and fairly rescued, considering the fuzzy properties of the parameters, such as the resource demand quantity, the dispatching time and the satisfaction degree, the railway emergency resources dispatching optimization model is studied, with multi- demand point, multi-depot, and multi-resource. Based on railway rescue features, it was proposed that the couple number of relief point - emergency point is the key to affect railway rescue cost and efficiency. Under the premise of the maximum satisfaction degree of quantity demanded at all emergency points, a multi-objective programming model is established by maximizing the satisfaction degree of dispatching time and the satisfaction degree of the couple number of relief point - emergency point. Combined with the ideal point method, a restrictive parameter interval method for optimal solution was designed, which can realize the quick seek of Pareto optimal solution. Furthermore, an example is given to verify the feasibility and effectiveness of the method.


2014 ◽  
Vol 538 ◽  
pp. 127-133 ◽  
Author(s):  
Zhao Ning Zhang ◽  
Zhong Zhou Hao ◽  
Zheng Gao

To alleviate the conflicts between the current flight traffic demand and the resource constraints of airspace, we need to improve the restrictions of flow allocation caused by the static air traffic flow allocation mode. The author analyzes the optimal allocation problem of dynamic adjusting flight flow and draws the conclusion that the problem should satisfy multiple targets, such as low flight delays, low flight cost and balancing the load of the route. Then consider a variety of limiting factors, such as the capacity of the route, flight planning, emergency situations, etc. Then establish multi-objective programming model of dynamic adjusting flight traffic. The objective function is determined by the flight cost, the flight delays and the value of the load balance. And the value of the load balance was first proposed according to the idea of least squares method. Then solve the model based on linear weighted technique. Finally the numerical result shows that the model can satisfy the multiple objectives and dynamic adjust the flight traffic optimally, that proves the rationality and validity of the model and the algorithm.


Sign in / Sign up

Export Citation Format

Share Document