batch processor
Recently Published Documents


TOTAL DOCUMENTS

33
(FIVE YEARS 8)

H-INDEX

7
(FIVE YEARS 1)

2021 ◽  
Vol 14 (3) ◽  
pp. 520
Author(s):  
Pratya Poeri Suryadhini ◽  
Sukoyo Sukoyo ◽  
Suprayogi Suprayogi ◽  
Abdul Hakim Halim

Purpose: This research develops a batch scheduling model for a three-stage flow shop with job processors in the first and second stages and a batch processor in the third stage. The model integrates production process activities and a product inspection activity to minimize the expected total actual flow time.Design/methodology/approach: The problem of batch scheduling for a three-stage flow shop is formulated as a mathematical model, and a heuristic algorithm is proposed to solve the problem. This model applies backward scheduling to accommodate the objective of minimizing the expected total actual flow time.Findings: This research has proposed a batch scheduling model for a three-stage flow shop with job and batch processors to produce multiple items and an algorithm to solve the model. The objective is to minimize total actual time. The resulting production batches can be sequenced between all types of products to minimize idle time, and the batch processor capacity affects the sample size and indirectly affects the production batch size.Originality/value: This research develops a batch scheduling model for a three-stage flow shop constituting job and batch processors and carrying out integrated production and inspection activities to minimize the expected total actual flow time


2018 ◽  
Vol 20 (1) ◽  
pp. 73-88
Author(s):  
Nita P.A Hidayat ◽  
Andi Cakravastia ◽  
T.M.A Ari Samadhi ◽  
Abdul Hakim Halim

This study is inspired by a batch scheduling problem in metal working industry which guarantees to satisfy a due date as a commitment to customers. Actual flowtime adopts the backward scheduling approach and considers the due date. Using the actual flowtime as the objective means that the solution  is oriented to satisfy the due date, and simultaneosly to minimize the length of time of the parts spending in the shop. This research is to address a problem of scheduling batches consisting of multiple items of parts processed on a batch processor where the completed parts must be delivered several time at different due dates. We propose an algorithm to solve the problem.


Sign in / Sign up

Export Citation Format

Share Document