underground station
Recently Published Documents


TOTAL DOCUMENTS

139
(FIVE YEARS 45)

H-INDEX

9
(FIVE YEARS 2)

Author(s):  
Nikita Sale

Abstract: The paper aimed at a detailed case study of cross-passage, which is forced to design and construct by connecting the station box and main tube tunnel of Marol Naka station in Mumbai Metro Line 3, since the marol Naka is densely populated area and elevated metro line is passing over an underground station, therefore further excavation of tunnel is done through the cross-passage. In these station, the cross- passage is constructed for public utilities for connecting the station box to the platform and also for the emergency exit. During tunnel construction, the cross passage is excavated after the main tunnel has been constructed. At the same time, the safety of the cross passage and the stability of the tunnel must be ensured by instrumentation and monitoring. Design of the cross- passage is achieved according to the principles of “New Austrian Tunnelling Method’ (NATM) and the composite lining structure is adopted. NATM is used to widen the station platform which is initially tunnelled by the TBM. The dimension of 230m long and 15m wide Marol Naka station has 16 cross-passages which are constructed connecting the station box to the platform; the observations and the designing part- Finite Element method is used in order to evaluate stress deformations induced on the cross-passage. Keywords: Cross passage, NATM, TBM, Finite element method, Marol Naka station, Emergency exit.


2021 ◽  
Vol 2021 ◽  
pp. 1-7
Author(s):  
Ying Zeng ◽  
Shiguang Xu ◽  
Shiqian Yin

China Earthquake Parameter Zoning (2016) has increased the seismic fortification intensity in Chengdu from VII to VIII. It is necessary to conduct in-depth discussion on the impact of the seismic performance of the built underground station structure. In this paper, a stratum-structure finite element model is established with a Chengdu subway station as an example. The model boundary adopts viscoelastic boundary, and the ground motion is input in the form of equivalent nodal force. The equivalent linearization method is used to consider the nonlinearity of soil materials. The time-history analysis of seismic fortification intensity of VII and VIII degrees is carried out, respectively. By comparing the calculation results of the two seismic fortification intensity ground motion conditions, it is concluded that the connection between the side wall and the floor is the weakest position of the station structure under the action of the earthquake; the seismic fortification intensity is increased from VII to VIII to the internal force of the structure. It has a relatively large impact, especially the most obvious impact on the bending moment. The results of the verification of the seismic time-history analysis show that the increase of fortification intensity will have a more obvious impact on the structural deformation, and the structural design of the station can meet the safety performance requirements of VII and VIII degrees of seismic fortification. The research has certain reference significance for the seismic safety evaluation of the built underground station structure in Chengdu area.


2021 ◽  
Author(s):  
Lubos Hladek ◽  
Stephan D. Ewert ◽  
Bernhard U. Seeber
Keyword(s):  

Author(s):  
Antonio Boni ◽  
Salvatore Favuzza ◽  
Mariano Giuseppe Ippolito ◽  
Fabio Massaro ◽  
Salar Modari ◽  
...  

2021 ◽  
pp. 101189
Author(s):  
Antoine Durand ◽  
Amine Mehel ◽  
Georges Fokoua ◽  
Frédéric Murzyn ◽  
Samuel Puech ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document