boiler feedwater
Recently Published Documents


TOTAL DOCUMENTS

63
(FIVE YEARS 6)

H-INDEX

7
(FIVE YEARS 1)

Author(s):  
Selcuk Selimli ◽  
Savas Sunay

The low-pressure steam requirement in the iron and steel production plant is obtained through pressure reduction stations with unrestrained expansion. In this study, the feasibility of obtaining the low-pressure steam that is needed in the plant in a backpressure turbine instead of pressure reduction stations has been studied. In this way, it is foreseen that a significant amount of wasted energy during the unrestrained expansion in pressure reduction stations, can be recovered as shaft work during the expansion process performed in the turbine. The obtained shaft work is planned to be used in the boiler feedwater pump drive. It is aimed to increase the efficiency of the system by the deactivation of boiler feedwater pump electric motors and as well as bringing the energy that is lost during the unrestrained expansion of the superheated steam to the system through the pump drive. The estimated size of energy saving of the system could be reached to 33.74%. The annual size of achievable saving has been determined by approximately 8,094,810 kWh and economically $509,973. The payback period of the estimated $683,079 investment is 1.34 years. A determined amount of saving is also equivalent to the reduction of 7,285,329 kg CO2 emission, annually.


JTAM ROTARY ◽  
2020 ◽  
Vol 2 (2) ◽  
pp. 235
Author(s):  
Yanuar Iswahyudi

Pada Desember 2016 hingga Januari 2017, terjadi penurunan kinerja PLTU Asam Asam Unit 3 yang signifikan dalam penyediaan tenaga listrik. Hal ini dikarenakan adanya permasalahan pada Boiler Feedwater Pump (BFP) 3B. Kemudian masalah harus diselesaikan oleh Turbin dan Kru Pemeliharaan Tambahan dengan beberapa perbaikan. Perbaikan BFP 3B berada pada masalah jarak jalan internal dan masalah poros tekuk. Setelah diperbaiki, data perhitungan menunjukkan bahwa efisiensi total pompa meningkat sebesar 10%, dan zona getaran berpindah dari zona D (berbahaya) ke zona A (aman untuk pengoperasian berkelanjutan). In December 2016 until January 2017, there was a significant decreasing performance of Unit 3 PLTU Asam Asam in supplying electric power. This was because of some problems in Boiler Feedwater Pump (BFP) 3B. Then the problems have to be solved by the Turbine and Auxiliary Maintenance Crew by some repairs. The repair of BFP 3B are in the internal running clearance problem and bending shaft problem. After the repair of them, calculation data show that the pump total efficiency increasing by 10 %, and the vibration zone move from D zone (dangerous) to A zone (safe for continuous operation).


2019 ◽  
Vol 58 (31) ◽  
pp. 14368-14379 ◽  
Author(s):  
Evelyn De Meyer ◽  
Tim Van Overstraeten ◽  
Jasmine Heyse ◽  
M. Rakib Uddin ◽  
Marjolein Vanoppen ◽  
...  

2018 ◽  
Vol 1 (1-2) ◽  
pp. 77-87 ◽  
Author(s):  
Arnold Janson ◽  
Joel Minier-Matar ◽  
Eman Al-Shamari ◽  
Altaf Hussain ◽  
Ramesh Sharma ◽  
...  

2018 ◽  
Author(s):  
António Castro ◽  
João P. Cardoso ◽  
Luís Filipe Mendes ◽  
Pedro Azevedo ◽  
João Farinha Mendes

Sign in / Sign up

Export Citation Format

Share Document