New Design of PMU for Real-Time Security Monitoring and Control of Wide Area Intelligent System

Author(s):  
Hak-Man Kim ◽  
Jin-Hong Jeon ◽  
Myong-Chul Shin ◽  
Tae-Kyoo Oh
2020 ◽  
Vol 286 ◽  
pp. 116832
Author(s):  
Yiming Huang ◽  
Yuxue Yuan ◽  
Lijun Yang ◽  
Di Wu ◽  
Shanben Chen

Author(s):  
Bhargav Appasani ◽  
Amitkumar Vidyakant Jha ◽  
Sunil Kumar Mishra ◽  
Abu Nasar Ghazali

AbstractReal time monitoring and control of a modern power system has achieved significant development since the incorporation of the phasor measurement unit (PMU). Due to the time-synchronized capabilities, PMU has increased the situational awareness (SA) in a wide area measurement system (WAMS). Operator SA depends on the data pertaining to the real-time health of the grid. This is measured by PMUs and is accessible for data analytics at the data monitoring station referred to as the phasor data concentrator (PDC). Availability of the communication system and communication delay are two of the decisive factors governing the operator SA. This paper presents a pragmatic metric to assess the operator SA and ensure optimal locations for the placement of PMUs, PDC, and the underlying communication infrastructure to increase the efficacy of operator SA. The uses of digital elevation model (DEM) data of the surface topography to determine the optimal locations for the placement of the PMU, and the microwave technology for communicating synchrophasor data is another important contribution carried out in this paper. The practical power grid system of Bihar in India is considered as a case study, and extensive simulation results and analysis are presented for validating the proposed methodology.


1976 ◽  
Vol 14 (6) ◽  
pp. 274-278 ◽  
Author(s):  
L. F. Donaghey ◽  
G. M. Bobba ◽  
D. Jacobs

2014 ◽  
Vol 971-973 ◽  
pp. 1033-1036
Author(s):  
Hui Jun Wang ◽  
Zhi Qun Yong

In view of the shortcoming such as wiring difficulties, poor scalability, and big cable usage in present mine security monitoring system, this paper puts forward a kind of substation monitoring and control system based on ZIGBEE and CAN. With the core of core, The system collects various measurement data of sensors through the ZIGBEE wireless network, realizes the to collect, and then through the CAN bus to realize the transmission of control commands and data of the up and down machine, and monitor the production parameters and environmental parameters in the coal mine. Experiments show that the monitoring substation is of high real-time performance, good stability, strong expansibility, etc., and can meet the requirements of the coal mine development and mining.


2012 ◽  
Vol 253-255 ◽  
pp. 705-715 ◽  
Author(s):  
Mohamed Elbanhawi ◽  
Milan Simic

This paper presents one application of industrial robots in the automation of renewable energy production. The robot supports remote performance monitoring and maintenance of salinity gradient solar ponds. The details of the design, setup and the use of the robot sampling station and the remote Data Acquisition (DAQ) system are given here. The use of a robot arm, to position equipment and sensors, provides accurate and reliable real time data needed for autonomous monitoring and control of this type of green energy production. Robot upgrade of solar ponds can be easily integrated with existing systems. Data logged by the proposed system can be remotely accessed, plotted and analysed. Thus the simultaneous and remote monitoring of a large scale network of ponds can be easily implemented. This provides a fully automated solution to the monitoring and control of green energy production operations, which can be used to provide heat and electricity to buildings. Remote real time monitoring will facilitate the setup and operations of several solar ponds around cities.


Sign in / Sign up

Export Citation Format

Share Document