Study on the Choice of Strategic Emerging Industries in Gansu Province Based on Multi-level Grey Model

Author(s):  
Zhonghua Luo ◽  
Qi Men ◽  
Lixin Yun
Author(s):  
Cao Liang ◽  
Feng Jingchun ◽  
Ren Yuan

With the development of China's economy, large-scale engineering and complex engineering are emerging. The Engineering Procurement Construction (EPC) project general contracting model is widely used in civil engineering, water conservancy, railway, water treatment, waste incineration plants and other large engineering area. The increasing complexity of construction technology and the risks are facing overwhelming and fragile supply chain. Based on the deep analysis of supply chain operation reference (SCOR) model, which is widely used in various fields of industry, this article puts forward the preliminary index system of supply chain risk of EPC project by analytic hierarchy process (AHP). The risk index system of waste incineration project including 5 first-level risk indicators and 27 second-level risk indicators has been established and determined. The multi-level grey model is used to evaluate the risk index, calculate the grey evaluation coefficient and the grey evaluation weight vector as well as the weight matrix, draw the specific risk evaluation value of the project, and sort the first level index. Finally, an EPC example of a waste incineration in Hubei Province is used to verify the feasibility and reliability of the method.


Author(s):  
Cao Liang ◽  
Feng Jingchun ◽  
Ren Yuan

With the development of China's economy, large-scale engineering and complex engineering are emerging. The Engineering Procurement Construction (EPC) project general contracting model is widely used in civil engineering, water conservancy, railway, water treatment, waste incineration plants and other large engineering area. The increasing complexity of construction technology and the risks are facing overwhelming and fragile supply chain. Based on the deep analysis of supply chain operation reference (SCOR) model, which is widely used in various fields of industry, this article puts forward the preliminary index system of supply chain risk of EPC project by analytic hierarchy process (AHP). The risk index system of waste incineration project including 5 first-level risk indicators and 27 second-level risk indicators has been established and determined. The multi-level grey model is used to evaluate the risk index, calculate the grey evaluation coefficient and the grey evaluation weight vector as well as the weight matrix, draw the specific risk evaluation value of the project, and sort the first level index. Finally, an EPC example of a waste incineration in Hubei Province is used to verify the feasibility and reliability of the method.


Author(s):  
Ferdinand Keller ◽  
Tatjana Stadnitski ◽  
Jakob Nützel ◽  
Renate Schepker
Keyword(s):  

Zusammenfassung. Fragestellung: Über Veränderungen in der emotionalen Befindlichkeit von Jugendlichen während einer Suchttherapie ist wenig bekannt. Methode: Die Jugendlichen füllten wöchentlich einen entsprechenden Fragebogen aus, analog ihre Bezugsbetreuer eine parallelisierte Kurzfassung. Von 42 Jugendlichen liegen insgesamt 853 Bogen und von den Bezugsbetreuern 708 Bogen vor. Die Fragebogen wurden zunächst faktorenanalytisch hinsichtlich ihrer Dimensionalität ausgewertet, anschließend wurden gruppenbezogene Verlaufsanalysen (Multi-Level-Modelle) und Abhängigkeitsanalysen auf Einzelfallebene (Zeitreihenanalysen) durchgeführt. Ergebnisse: Im Jugendlichenfragebogen ergaben sich vier Faktoren: negative Befindlichkeit, Wertschätzung von Therapie/Betreuung, Motivation und Suchtdynamik. Die Übereinstimmung zwischen den Jugendlichen- und der (einfaktoriellen) Betreuereinschätzung fiel insgesamt niedrig bis mäßig aus, brachte aber auf Einzelfallebene differenziertere Ergebnisse. Im Verlauf nahmen die Werte auf allen vier Jugendlichenskalen ab. Einzig der Verlauf der Wertschätzung in der Eingewöhnungsphase war prädiktiv für den späteren Abbruch der Maßnahme: Bei den Abbrechern nahm die Wertschätzung ab, während sie bei den Beendern initial stieg. Schlussfolgerungen: Der bedeutsamste Faktor in Bezug auf die Therapiebeendigung suchtkranker Jugendlicher scheint die Wertschätzung von Therapie/Betreuung zu sein, während die Motivation jugendtypische Schwankungen aufweist. Der Suchtdynamik kam eine deutlich weniger bedeutende Rolle zu als allgemein angenommen. Programme in der Langzeittherapie sollten die Wertschätzung von Therapie/Betreuung künftig mehr fokussieren als die Suchtdynamik.


2017 ◽  
Author(s):  
Todd D. Smith ◽  
Mari-Amanda Dyal ◽  
Yongjia Pu ◽  
Stephanie Dickinson ◽  
David M. DeJoy

2013 ◽  
Author(s):  
Ceri R. Jones ◽  
Tom Cox
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document