On Designing a Target-Independent DSL for Safe OS Process-Scheduling Components

Author(s):  
Julia L. Lawall ◽  
Anne-Françoise Le Meur ◽  
Gilles Muller
Keyword(s):  
1988 ◽  
Vol 23 (3) ◽  
pp. 7-12 ◽  
Author(s):  
David Hemmendinger
Keyword(s):  

2014 ◽  
Vol 602-605 ◽  
pp. 571-574
Author(s):  
Mao Liu

In the construction process of large-scale civil engineering and architecture, how to realize rational scheduling is a key problem need to be solved. This paper studies the construction process of the large-scale Civil Engineering decoration companies, particularly the construction with parallel multiple sets of team and multi-project. To solve the problem, the paper designs a special scheduling algorithm and carries out simulation. The scheduling algorithm shorts the duration of construction and improves enterprise efficiency.


1997 ◽  
Vol 36 (2) ◽  
pp. 81-121 ◽  
Author(s):  
G. Applequist ◽  
O. Samikoglu ◽  
J. Pekny ◽  
G. Reklaitis

2014 ◽  
Vol 889-890 ◽  
pp. 1207-1212
Author(s):  
Guo En Sun ◽  
Zai Lin Guan ◽  
Lei Yue ◽  
Zhi Ming Zheng ◽  
Han Lin

Traditional planning methods ignore the enterprise production capacity,the paper depend on the specific case in enterprise production to build a Production Scheduling System which applies Drum-Buffer-Rope theory. This system proposes the high output, low work in process and on time delivery as the goals, considering the bottleneck resource as well as providing the master production plan with the bottleneck resource, in addition employing the simulation optimization software-Simio to optimize the bottleneck process scheduling and raise the utilization ratio of bottleneck resource.


Sign in / Sign up

Export Citation Format

Share Document