A Case Study on Environment Risk Assessment Methods of Coastal Petrochemical Project

Author(s):  
Yuting Wu ◽  
Ling Cai ◽  
Honggang Yang ◽  
Yaojian Wu
2021 ◽  
Vol 13 (5) ◽  
pp. 2627
Author(s):  
Milan Holický ◽  
Miroslav Sýkora

The most important reliability approaches affecting sustainability in construction consist of the target reliability levels, verification methods, and construction or intervention procedures. The optimum target reliability levels can be specified based on probabilistic optimisation considering sustainability aspects including building costs, expected economic, social, and environmental consequences of construction, and possible failures. It appears that the derived reliability levels are strongly dependent on sustainability aspects and may be lower for the assessment of existing structures than for the design of new structures. The most efficient verification methods are based on advanced probabilistic approaches, including risk assessment methods considering actual properties of the structure and related failure consequences. It has been shown that sustainability in construction may be significantly affected by the design and assessment methods. The case study demonstrates that advanced reliability approaches commonly save 10–20% of the consumption of structural materials and natural resources.


2018 ◽  
Author(s):  
Michael H. Azarian

Abstract As counterfeiting techniques and processes grow in sophistication, the methods needed to detect these parts must keep pace. This has the unfortunate effect of raising the costs associated with managing this risk. In order to ensure that the resources devoted to counterfeit detection are commensurate with the potential effects and likelihood of counterfeit part usage in a particular application, a risk based methodology has been adopted for testing of electrical, electronic, and electromechanical (EEE) parts by the SAE AS6171 set of standards. This paper provides an overview of the risk assessment methodology employed within AS6171 to determine the testing that should be utilized to manage the risk associated with the use of a part. A scenario is constructed as a case study to illustrate how multiple solutions exist to address the risk for a particular situation, and the choice of any specific test plan can be made on the basis of practical considerations, such as cost, time, or the availability of particular test equipment.


2000 ◽  
Vol 14 (5) ◽  
pp. 1264-1270 ◽  
Author(s):  
Elisabeth Slooten ◽  
David Fletcher ◽  
Barbara L. Taylor
Keyword(s):  

2020 ◽  
Vol 34 (5) ◽  
pp. 627-640 ◽  
Author(s):  
Shi Xianwu ◽  
Qiu Jufei ◽  
Chen Bingrui ◽  
Zhang Xiaojie ◽  
Guo Haoshuang ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document