Thermodynamic and Environmental Impact Study of a Stand-Alone Biomass Gasifier System for Sustainable and Economically Feasible Power Generation in a Remote Village

Author(s):  
Sampad Kumar Das ◽  
Prokash Chandra Roy ◽  
Sudip Ghosh
Author(s):  
Bašić Marija ◽  
Kranjčić Nikola ◽  
Jug Jasmin ◽  
Đurin Bojan

Roads are important infrastructure facilities that enable traffic accessibility, i.e. they improve the quality of transport communication between people, goods and innovations. The Podravina high-speed road project was designed with the aim of developing Podravina and Slavonia and enabling a better connection between them and the rest of Croatia. Road construction is a complex process that requires a location permit before construction begins. This paper is written with the aim of presenting in detail the process of obtaining a location permit, which is preceded by obligatory preliminary work. Its complexity depends on the type of a road, its purpose and characteristics of the area through which a planned road passes. The Podravina high-speed road is the largest infrastructure project in that part of Croatia and therefore detailed preliminary work is required. This paper describes some types of preliminary work which include geological, geomechanical and climatic tests. The paper presents a project justification study, an environmental impact study, an environmental impact study, a construction and a technical study as well as a spatial transport analysis. Based on the chosen Podravina high-speed road route, a general design was created by using a road design software program “Platea”.


2006 ◽  
Vol 86 (1) ◽  
pp. 221-230
Author(s):  
Dejan Filipovic ◽  
Bogdan Lukic

In compatibility with actual recommendations and policy which leads to improvement and preservation of integral environment and especially its natural values, it is necessary to implement active and integral approach to all variety of planning documents. In order to visualize the impact of highway through Belgrade on its surroundings, the solutions of the traffic artery were analyzed from the aspect of the protection of the environment in the sense of definition of harmful impacts and proposals of measures for their prevention or removal. The basic starting point was to get the answer whether and which, from ecological aspect, protection measures should be taken. The paper will show specific details of making the Belgrade highway environmental impact study.


1999 ◽  
Vol 39 (2) ◽  
pp. 119
Author(s):  
K.N. Davie ◽  
T.A. Winters

This paper discusses the relationship between the Aboriginal heritage clearance process and the environmental impact assessment process. The current Western Australian legislation and the Murrin Murrin nickel project and other Western Australian projects are used as a case study, although similar methods and issues are applicable to most states within Australia. The paper investigates areas where delays may occur and proposes a model which can be implemented to maximise the level of certainty for a project.


2015 ◽  
Vol 105 (3) ◽  
pp. 1-8
Author(s):  
Naeem Hussain ◽  
Steve Kite ◽  
Franki Chiu ◽  
Kok Kong Chin ◽  
Garry Anderson ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document