Recommended practice for repair and remanufacture of well control equipment used within the UK Continental Shelf

1995 ◽  
Vol 36 (3) ◽  
pp. 179
2018 ◽  
Vol 465 (1) ◽  
pp. 77-93 ◽  
Author(s):  
Jon Gluyas ◽  
Longxun Tang ◽  
Stuart Jones
Keyword(s):  

Author(s):  
Guus de Vries ◽  
Joop van der Meer ◽  
Harald Brennodden ◽  
Stein Wendel

Located approximately 120 km offshore, Ormen Lange, with an estimated 400 billion m3 of natural gas, is the second-largest gas discovery on the Norwegian shelf. The water depth is up to 850 meters, making Ormen Lange the first deepwater project on the Norwegian Continental Shelf. The development of Ormen Lange is under shared operatorship between Norsk Hydro and Shell. Ormen Lange’s untreated well stream will be transported to shore in two 120 km long, 30-inch diameter pipelines to a processing plant at Nyhamna, Norway. From there, gas will be exported via a 42” 1200 km sub sea pipeline (Langeled) to Easington at the east coast of the UK. The pipelines have to pass over the Storegga slide edge which rises 200–300 meters toward the continental shelf in very steep slopes, which are also encountered in the nearshore Bjo¨rnsundet area. The uneven and steep seabed conditions require the use of approximately 2.8 million tons of rock to support and stabilize the pipelines. The sea bottom conditions on the Norwegian continental shelf are characterized by many outcrops as well as very soft clay deposits. The immediate settlement of the rock supports during installation form a significant amount of the total required rock volume. In this paper a procedure is presented on how to assess these immediate settlements recognizing four contributing components all being discussed separately. The calculation results are compared to a back-analysis, performed during the execution of the Ormen Lange rockworks, proving the suitability of the calculation method.


2020 ◽  
Vol 52 (1) ◽  
pp. 664-678 ◽  
Author(s):  
M. Camm ◽  
L. E. Armstrong ◽  
A. Patel

AbstractThe Lower Cretaceous Britannia Field development is one of the largest and most significant undertaken on the UK Continental Shelf. Production started in 1998 via 17 pre-drilled development wells and was followed by a decade of intensive drilling, whereby a further 40 wells were added. In 2000 Britannia's plateau production of 800 MMscfgd supplied 8% of the UK's domestic gas requirements.As the field has matured, so too has its development strategy. Initial near-field development drilling targeting optimal reservoir thickness was followed by extended reach wells into the stratigraphic pinchout region. In 2014 a further strategy shift was made, moving from infill drilling to a long-term compression project to maximize existing production. During its 20-year history the Britannia Platform has undergone numerous changes. In addition to compression, production from five satellite fields has been routed through the facility: Caledonia (2003), Callanish and Brodgar (2008), Enochdhu (2015) and Alder (2016). A new field, Finlaggan, is due to be brought through Britannia's facilities in 2020, helping to maximize value from the asset for years to come.As Britannia marks 20 years of production it has produced c. 600 MMboe – surpassing the original ultimate recoverable estimate of c. 570 MMboe – and is still going strong today.


2019 ◽  
Author(s):  
Leandro Diniz Brandão Rocha ◽  
José Eugênio de Almeida Campos ◽  
Cristiano Venâncio Xavier ◽  
Thijs Visser ◽  
Felipe Freitas ◽  
...  

1996 ◽  
Vol 109 (1) ◽  
pp. 43-57
Author(s):  
J. L. Knight ◽  
B. J. Shevlin ◽  
D. C. Edgar ◽  
P. Dolan
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document