Erratum to “Performance study of the reduction of excess sludge and simultaneous removal of organic carbon and nitrogen by a combination of fluidized- and fixed-bed bioreactors with different structured macroporous carriers” [Biochem. Eng. J. 39 (2008) 344–352]
Keyword(s):
2008 ◽
Vol 39
(2)
◽
pp. 344-352
◽
Keyword(s):
2003 ◽
Vol 36
(10)
◽
pp. 1156-1162
◽
Keyword(s):
2017 ◽
Vol 191
◽
pp. 150-156
◽
Keyword(s):
2014 ◽
Vol 85
◽
pp. 30-37
◽
Keyword(s):
1996 ◽
Vol 29
(3)
◽
pp. 464-469
◽
Keyword(s):
Keyword(s):
1985 ◽
Vol 17
(6-7)
◽
pp. 929-940
◽
Keyword(s):
2020 ◽
Keyword(s):
Keyword(s):