scholarly journals A Case Study of Operation Optimization on A Renewable Energy Building by E-CPS Method: From Both Sides of Supply and Demand

2019 ◽  
Vol 158 ◽  
pp. 6145-6151 ◽  
Author(s):  
Shengyuan Zhong ◽  
Shuai Deng ◽  
Jun Zhao ◽  
Yongzhen Wang ◽  
Pengwei Su
Energies ◽  
2018 ◽  
Vol 11 (11) ◽  
pp. 3082 ◽  
Author(s):  
Yongming Zhang ◽  
Zhe Yan ◽  
Li Li ◽  
Jiawei Yao

As the quantity of direct current (DC) load and wireless power transmission (WPT) devices are continuously increasing in building, in order to efficiently utilize renewable energy (which outputs DC power) such as photovoltaic (PV), especially for building integrated photovoltaic (BIPV), and regeneration energy from elevators (which also outputs DC power), a novel building power distribution system architecture is explored in consideration of the characteristics of supply and demand-side in this paper. The proposed architecture is a hybrid framework integrated with conventional alternating current (AC) power distribution system, DC power distribution and WPT system. The applied AC and DC hybrid power distribution system has higher conversion efficiency than a single AC power system, which indicates that the former is becoming an important trend of building power distribution. In addition, the results of experimental test in a case study suggest that the proposed architecture can provide fine service for efficient application of renewable energy and regeneration energy in building. The obtained results also can serve as a foundation to promote the development of building power distribution system and related practical application in building.


Sign in / Sign up

Export Citation Format

Share Document