Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: A real case study from high-tech industry

2020 ◽  
Vol 282 (3) ◽  
pp. 989-1010
Author(s):  
Omer Faruk Yilmaz ◽  
Gokhan Ozcelik ◽  
Fatma Betul Yeni
DYNA ◽  
2020 ◽  
Vol 87 (212) ◽  
pp. 179-188 ◽  
Author(s):  
Néstor Raúl Ortíz Pimiento ◽  
Francisco Javier Diaz Serna

New product development projects (NPDP) face different risks that may affect the scheduling. In this article, the purpose was to develop an optimization model to solve the RCPSP in NPDP and obtain a robust baseline for the project. The proposed model includes three stages: the identification of the project’s risks, an estimation of activities’ duration, and the resolution of an integer linear program. Two versions of the model were designed and compared in order to select the best one. The first version uses a method to estimate the activities’ duration based on the expected value of the impact of the risks and the second version uses a method based on the judgmental risk analysis process. Finally, the two version of the model were applied to a case study and the best version of the model was identified using a robustness indicator that analyses the start times of the baselines generated.


2007 ◽  
Vol 38 (4) ◽  
pp. 45-59 ◽  
Author(s):  
Vittorio Chiesa ◽  
Federico Frattini ◽  
Valentina Lazzarotti ◽  
Raffaella Manzini

Author(s):  
J Poolton ◽  
I Barclay

There are few studies that have found an adequate means of assessing firms based on their specific needs for a concurrent engineering (CE) approach. Managers interested in introducing CE have little choice but to rely on their past experiences of introducing change. Using data gleaned from a nine month case study, a British-wide survey and a series of in-depth interviews, this paper summarizes the findings of a research study that examines how firms orientate themselves towards change and how they go about introducing CE to their operations. The data show that there are many benefits to introducing CE and that firms differ with respect to their needs for the CE approach. A tentative means to assess CE ‘needs’ is proposed which is based on the level of complexity of goods produced by firms. The method is currently being developed and extended to provide an applications-based framework to assist firms to improve their new product development performance.


Sign in / Sign up

Export Citation Format

Share Document