scholarly journals An evaluation of offshore wind power production by floatable systems: A case study from SW Portugal

Energy ◽  
2017 ◽  
Vol 131 ◽  
pp. 239-250 ◽  
Author(s):  
A. Pacheco ◽  
E. Gorbeña ◽  
C. Sequeira ◽  
S. Jerez
Wind Energy ◽  
2021 ◽  
Author(s):  
Yi‐Hui Wang ◽  
Ryan K. Walter ◽  
Crow White ◽  
Matthew D. Kehrli ◽  
Benjamin Ruttenberg

2021 ◽  
Author(s):  
Ida Marie Solbrekke ◽  
Asgeir Sorteberg ◽  
Hilde Haakenstad

Abstract. A new high-resolution (3 km) numerical mesoscale weather simulation spanning the period 2004–2018 is validated for offshore wind power purposes for the North Sea and Norwegian Sea. The NORwegian hindcast Archive (NORA3) was created by dynamical downscaling, forced with state-of-the-art hourly atmospheric reanalysis as boundary conditions. A validation of the simulated wind climatology has been carried out to determine the ability of NORA3 to act as a tool for planning future offshore wind power installations. Special emphasis is placed on evaluating offshore wind power-related metrics and the impact of simulated wind speed deviations on the estimated wind power and the related variability. The general conclusion of the validation is that the NORA3 data is rather well suited for wind power estimates, but gives slightly conservative estimates on the offshore wind metrics. Wind speeds are typically 5 % (0.5 ms−1) lower than observed wind speeds, giving an underestimation of offshore wind power of 10 %–20 % (equivalent to an underestimation of 3 percentage point in the capacity factor), for a selected turbine type and hub height. The model is biased towards lower wind power estimates because of overestimation of the frequency of low-speed wind events (< 10 ms−1) and underestimation of high-speed wind events (> 10 ms−1). The hourly wind speed and wind power variability are slightly underestimated in NORA3. However, the number of hours with zero power production (around 12 % of the time) is fairly well captured, while the duration of each of these events is slightly overestimated, leading to 25-year return values for zero-power duration being too high for four of the six sites. The model is relatively good at capturing spatial co-variability in hourly wind power production among the sites. However, the observed decorrelation length was estimated to be 432 km, whereas the model-based length was 19 % longer.


2016 ◽  
Vol 87 ◽  
pp. 61-68 ◽  
Author(s):  
Nicola Destro ◽  
Magnus Korpås ◽  
Julian F. Sauterleute

2013 ◽  
Vol 448-453 ◽  
pp. 1871-1874
Author(s):  
Yuan Xie

China has great potential in offshore wind energy and makes an ambitious target for offshore wind power development. Operation and Maintenance (O&M) of offshore wind turbines become more and more important for China wind industry. This study introduces the current offshore wind power projects in China. Donghai Bridge Offshore Demonstration Wind Farm (Donghai Bridge Project) is the first commercial offshore wind power project in China, which was connected to grid in June 2010. O&M of Donghai Bridge Project represent the state-of-the-art of China offshore O&M. During the past two and half years, O&M of Donghai Bridge Project has gone through three phases and stepped into a steady stage. Its believed that analysis of O&M of Donghai Bridge Project is very helpful for Chinas offshore wind power in the future.


2021 ◽  
Vol 6 (5) ◽  
pp. 1205-1226
Author(s):  
Christoffer Hallgren ◽  
Stefan Ivanell ◽  
Heiner Körnich ◽  
Ville Vakkari ◽  
Erik Sahlée

Abstract. With a rapidly increasing capacity of electricity generation from wind power, the demand for accurate power production forecasts is growing. To date, most wind power installations have been onshore and thus most studies on production forecasts have focused on onshore conditions. However, as offshore wind power is becoming increasingly popular it is also important to assess forecast quality in offshore locations. In this study, forecasts from the high-resolution numerical weather prediction model AROME was used to analyze power production forecast performance for an offshore site in the Baltic Sea. To improve the AROME forecasts, six post-processing methods were investigated and their individual performance analyzed in general as well as for different wind speed ranges, boundary layer stratifications, synoptic situations and in low-level jet conditions. In general, AROME performed well in forecasting the power production, but applying smoothing or using a random forest algorithm increased forecast skill. Smoothing the forecast improved the performance at all wind speeds, all stratifications and for all synoptic weather classes, and the random forest method increased the forecast skill during low-level jets. To achieve the best performance, we recommend selecting which method to use based on the forecasted weather conditions. Combining forecasts from neighboring grid points, combining the recent forecast with the forecast from yesterday or applying linear regression to correct the forecast based on earlier performance were not fruitful methods to increase the overall forecast quality.


2018 ◽  
Vol 144 (2) ◽  
pp. 05017006
Author(s):  
Mircea Scripcariu ◽  
Gabriela Nicoleta Sava ◽  
Stefanita Pluteanu ◽  
Oana Udrea

2020 ◽  
Author(s):  
Bedassa R. Cheneka ◽  
Simon J. Watson ◽  
Sukanta Basu

Abstract. Knowledge about the expected duration and intensity of wind power ramps is important when planning the integration of wind power production into an electricity network. How to detect and classify wind power ramps is not straightforward due to the large range of events that are observed and the stochastic nature of the wind. The development of an algorithm that can detect and classify wind power ramps is thus of some benefit to the wind energy community. In this study, we describe a relatively simple methodology using a wavelet transform to discriminate ramp events above stochastic variations using randomly shuffled wind power surrogates. To illustrate our approach, we used aggregated Belgian offshore wind power production data to characterise wind power ramps over a period of 10 days. We further illustrate the utility of the methodology by extracting distributions of ramp rates and their duration using two years of wind power production data. This brief study showed that there was a strong correlation between ramp rate and ramp duration, especially for up-ramps, that the majority of ramp events were less than 15 hours with a median duration of around eight hours and that ramps with a duration of more than a day were rare.


Sign in / Sign up

Export Citation Format

Share Document