Risk management of public-private partnership charging infrastructure projects in China based on a three-dimension framework

Energy ◽  
2018 ◽  
Vol 165 ◽  
pp. 1089-1101 ◽  
Author(s):  
Yunna Wu ◽  
Zixin Song ◽  
Lingwenying Li ◽  
Ruhang Xu
EDPACS ◽  
2021 ◽  
Vol 63 (5) ◽  
pp. 6-19
Author(s):  
Alex Sidorenko ◽  
Vladimir Kilinkarov ◽  
Alexey Belkov

2021 ◽  
Author(s):  
Karthikeyan Loganathan ◽  
Mohammad Najafi ◽  
Vinayak Kaushal ◽  
Pius Agyemang

2009 ◽  
Vol 13 (3) ◽  
pp. 219-228 ◽  
Author(s):  
Antti Tieva ◽  
Juha-Matti Junnonen

Public‐private‐partnership projects are long term, complex and very challenging contractual arrangements and relationships. They bring new roles for public sector and also for private sector in terms of construction and services. This paper will go through some features of the Finnish PPPs. Proactive law focuses in practical views as regards contract law and contractual issues. The main target is to prevent problems instead of confronting them. This paper will clarify what proactive law is about in terms of contract law and contracting especially in PPPs. For instance, 20–40 years’ partnership relation with PPPs brings up also dozens of different risks into the picture. This paper will discuss the risks and risk management in terms of proactive law and after that, focus on PPPs in Finland. Santruka Viešojo ir privataus sektoriu partnerystes (VPP) projektai ‐ tai ilgalaikiai, sude tin gi ir itin daug pastangu reikalaujantys sutartiniai susitarimai ir santykiai. Ne tik viešajame, bet ir privačiajame sektoriuje jie sukuria naujus, su statyba ir paslaugomis susijusius, vaidmenis. Šiame darbe apžvelgiami kai kurie Suomijos VPP bruožai. Iniciatyvi teise glaudžiai susijusi su prak ti nemis pažiūromis, sutarčiu teise ir pan. Pagrindinis tikslas ‐ išvengti problemu užuot jas sprendus. Šiame darbe paaiškinama iniciatyvios teises esme sudarant sutartis, ypač VPP. Pavyzdžiui, kai VPP trunka 20–40 metu, susiduriama su daugybe ivairiu rizikos rūšiu. Todel straipsnyje pirmiausia aptariamos rizikos rūšys ir rizikos valdymo būdai taikant iniciatyvia teise, o po to ‐ Suomijos VPP.


2012 ◽  
Vol 18 (5) ◽  
pp. 675-684 ◽  
Author(s):  
Yongjian Ke ◽  
ShouQing Wang ◽  
Albert P. C. Chan

Project risks were not properly managed in the many past Public-Private Partnership (PPP) projects in China. Although numerous research studies have been conducted on risk management in China's PPP projects, the realization of risk management in China's construction industry especially in PPP projects with high risk exposure and complicated contract structure has hitherto not been well studied. This paper therefore attempted to examine the current use of risk management in China's PPP projects by an empirical survey. The results indicated that the use of risk management was inadequate; qualitative risk analysis methods were preferred to quantitative and semi-quantitative methods; risk management usage in the execution was found to be much higher than in the planning, conceptual or termination stage; interviewees were unfamiliar with most of the risk identification and assessment tools. All above could be partly due to the project nature, but more fundamentally due to the local industrial culture. The absence of risk management culture was found to be the dominant factor which limited the implementation of risk management in practice. Recommendations to alleviate the difficulties of risk management were thereafter provided in this paper.