A robust multi-response VNS-aiNet approach for solving scheduling problems under unrelated parallel machines environments

2021 ◽  
pp. 115140
Author(s):  
Rodney Oliveira Marinho Diana ◽  
Sérgio Ricardo de Souza ◽  
Elizabeth Fialho Wanner
2014 ◽  
Vol 2014 ◽  
pp. 1-7 ◽  
Author(s):  
Guang-Qian Zhang ◽  
Jian-Jun Wang ◽  
Ya-Jing Liu

munrelated parallel machines scheduling problems with variable job processing times are considered, where the processing time of a job is a function of its position in a sequence, its starting time, and its resource allocation. The objective is to determine the optimal resource allocation and the optimal schedule to minimize a total cost function that dependents on the total completion (waiting) time, the total machine load, the total absolute differences in completion (waiting) times on all machines, and total resource cost. If the number of machines is a given constant number, we propose a polynomial time algorithm to solve the problem.


2009 ◽  
Vol 122 (2) ◽  
pp. 755-762 ◽  
Author(s):  
Alessandro Agnetis ◽  
Arianna Alfieri ◽  
Gaia Nicosia

Sign in / Sign up

Export Citation Format

Share Document