Operational feasibility of biomass combustion with in situ CO2 capture by CaO during 360 h in a 300 kWth calcium looping facility
2020 ◽
Vol 59
(18)
◽
pp. 8571-8580
Keyword(s):
2019 ◽
Vol 198
◽
pp. 111899
◽
Keyword(s):
2011 ◽
Vol 5
(3)
◽
pp. 512-520
◽
2020 ◽
Vol 28
(3)
◽
pp. 3566-3578
Keyword(s):
2012 ◽
Vol 51
(40)
◽
pp. 13046-13053
◽
Keyword(s):
2013 ◽
Vol 53
(3)
◽
pp. 1064-1072
◽
Keyword(s):