Charge material distribution behaviour in blast furnace charging system

2020 ◽  
Vol 366 ◽  
pp. 22-35 ◽  
Author(s):  
Deside Kudzai Chibwe ◽  
Geoffrey Michael Evans ◽  
Elham Doroodchi ◽  
Brian Joseph Monaghan ◽  
David John Pinson ◽  
...  
2019 ◽  
Vol 964 ◽  
pp. 185-192
Author(s):  
Sungging Pintowantoro ◽  
Mas Irfan P. Hidayat ◽  
Fakhreza Abdul ◽  
Hamzah Syaifullah

The abundant of nickel ore resources in Indonesia and the regulations of Law of Coals and Minerals No. 4 year 2009 cause the development of nickel ore processing technology. One of the proven nickel ore processing technology is Mini Blast Furnace (MBF). When, the raw materials were fed to the MBF, there is a charging system to ensure good distribution of raw materials in MBF. The double bell charging system has an important role on the distribution of burden material in MBF. By optimizing the distribution and layers of the material burden, it will increase the stability and efficiency of the MBF process. Therefore, this study focused on analyzing the effect of large bell angle on the distribution of burden material in MBF using discrete element method. After analyzed, large bell angle differences produce different burden material distribution. For particle distribution, particles of small density (coal and dolomitee) tend to be concentrated in the center zone and particles of large density (ore) tend to be concentrated in the intermediate and peripheral zone. The larger angle of the large bell will increase particle falling velocity and the kinetic energy of the burden material. The most stable layer in MBF was obtained when using 65o bell angle. The MBF with 65o large bell angle is the best bell angle for MBF with capacity of 250 ton/day due to the greatest possibility of central working furnace operation.


Author(s):  
I. F. Iskakov ◽  
G. A. Kunitsyn ◽  
D. V. Lazarev ◽  
А. А. Red`kin ◽  
S. A. Trubitsyn ◽  
...  

To use effectively internal raw material base, JSC “Ural Steel” accomplished I category major overhaul of the blast furnace No. 2. The main purpose of the overhaul was to design a rational profile which could ensure an ability to operate with a charge containing 95 % of Mikhailovskii GOK (mining and concentrating plant) pellets having basicity of 0.5 by CaO/SiO2. The blast furnace No. 2 having useful volume of 1232 m3, was constructed by design of Danieli Corus, the Netherlands, and was blown in on December 30, 2020. In the process of guarantee tests, step-by-step increase of Mikhailovskii GOK pellets (Fetotal = 60.5 %, CaO/SiO2 = 0.5) content in the charge iron ore part was being accomplished from 55 to 95.1%. Charging of the blend containing pellets in the amount of 55% of iron ore part, was done by charging system 4OOCC + 1COOCC (Ore - Coke) with filling level 1.5 m. Under conditions of pellets part increase in the blend, the charging system was changed to decrease their content at the periphery, to increase it in the ore ridge zone and make it intermediate between periphery and the ore ridge. At the pellets share in the iron ore raw materials 0.75 the charging system was used as the following: 3OOCC + 1COOC + 1COOCC, while at the content 95.1% the following charging system was used: 2COOC + 2COOC + 1COOCC. It was noted that in the period of guarantee tests the furnace running was smooth. The average silicon content in the hot metal was 0.70% at the standard deviation 0.666. Sulfur content in the hot metal did not exceed 0.024%, the blowing and natural gas consumption figures were 2100 m3/min and 11000 m3/min correspondently, oxygen content in the blowing 26.5%, hot blowing and top smoke pressure figures were 226.5 and 109.8 KPa correspondently. The productivity of the furnace was reached as high as 2358 t/day at the specific coke rate 433 kg/t of hot metal. After guarantee tests completion, the pellets content in the iron ore part was decreased gradually from 95 down to 50%. The decreasing was made by 5% in every 6 hours of operation. Application of the mastered technology of the blast furnace No. 2 with the increased share of pellets will enable to stably supply the blast furnaces No. 1, 3 and 4 by iron ore raw materials in the proportion of 30-35% of pellets and 65-70% of sinter.


Metallurgist ◽  
1957 ◽  
Vol 1 (1) ◽  
pp. 15-17
Author(s):  
P. S. Balevich

2015 ◽  
Vol 45 (7) ◽  
pp. 503-506 ◽  
Author(s):  
S. V. Filatov ◽  
V. I. Basov ◽  
I. F. Kurunov

2009 ◽  
Vol 49 (4) ◽  
pp. 479-486 ◽  
Author(s):  
Hiroshi Mio ◽  
Satoshi Komatsuki ◽  
Masatoshi Akashi ◽  
Atsuko Shimosaka ◽  
Yoshiyuki Shirakawa ◽  
...  

Metallurgist ◽  
1985 ◽  
Vol 29 (4) ◽  
pp. 130-132
Author(s):  
L. M. Arist ◽  
A. N. Gorodetskii ◽  
E. A. Yarovinskii ◽  
E. Ya. Klotsman

1992 ◽  
Vol 31 (4) ◽  
pp. 330-332
Author(s):  
Shoji Miyagawa ◽  
Kanji Takeda ◽  
Seiji Taguchi ◽  
Teruaki Morimoto ◽  
Hirotoshi Fujimori

Sign in / Sign up

Export Citation Format

Share Document