scholarly journals NEW NON-DESTRUCTIVE CHEMICAL ANALYSIS

1961 ◽  
Vol 39 (40) ◽  
pp. 15
1998 ◽  
Vol 278-281 ◽  
pp. 852-857
Author(s):  
G. Chiari ◽  
R. Compagnoni ◽  
R. Giustetto

2016 ◽  
Vol 76 ◽  
pp. 30-39 ◽  
Author(s):  
Ainara Gredilla ◽  
Silvia Fdez-Ortiz de Vallejuelo ◽  
Nerea Elejoste ◽  
Alberto de Diego ◽  
Juan Manuel Madariaga

2018 ◽  
Vol 23 (1) ◽  
pp. 223-234
Author(s):  
A.M. Ryniewicz ◽  
Ł. Bojko ◽  
A. Ryniewicz ◽  
P. Pałka ◽  
W. Ryniewicz

AbstractEndoprosthesis stem fractures are among the rarest complications that occur after hip joint arthroplasty. The aim of this paper is to evaluate the causes of the fractures of the Aura II stem neck, which is an element of an endoprosthesis implanted in a patient. In order to achieve it, a radiogram was evaluated, the FEM analysis was carried out for the hip joint replaced using the Aura II prosthesis and scanning tests as well as a chemical analysis were performed for the focus of fatigue. The tests performed indicate that the most probable causes leading to the fatigue fracture of the Aura II stem under examination were material defects in the process of casting and forging (forging the material with delamination and the presence of brittle oxides and carbides) that resulted in a significant reduction of strength and resistance to corrosion. In the light of an unprecedented stem neck fracture, this information should be an indication for non-destructive tests of ready-made stems aiming to discover the material and technological defects that may arise in the process of casting and drop forging.


1999 ◽  
Vol 343-344 ◽  
pp. 35-38 ◽  
Author(s):  
B. G«lnander ◽  
T. Käämbre ◽  
P. Blomquist ◽  
E. Nilsson ◽  
J. Guo ◽  
...  

2015 ◽  
Vol 818 ◽  
pp. 129-132
Author(s):  
Robert Maršál ◽  
Jitka Podjuklová ◽  
René Siostrzonek ◽  
Daniela Pavelková ◽  
Lenka Koldová ◽  
...  

This contribution solves the character of corrosive damage of the tubes, steam generating tubes of dry-bottom boiler combustion chamber in power plant engineering, and deals with the aspects related to the corrosion criteria of the carbon steel. The laboratory test results of samples applied on tubes that were subject to non-destructive and destructive tests are analyzed in one part of the work. The samples of greater incidence of corrosion products, which caused the failure of the integrity of the steam generating tubes, were tested. The work deals in details with the results of laboratory and chemical analysis of boiler water from the previous periods. The thesis evaluates the amount and frequency of P2O5 dosing cycles. The work also deals with the proposal of corrective measures that shall lead to the chemical balance of the boiler water. It proposes a continuous correlation methodology for chemical stabilization.


Sign in / Sign up

Export Citation Format

Share Document