scholarly journals Designing adaptive time resource management cost function for cognitive radar

2020 ◽  
Vol 14 (10) ◽  
pp. 1571-1582 ◽  
Author(s):  
Mohammad Ghadian ◽  
Reza Fatemi Mofrad ◽  
Bijan Abbasi Arand
Author(s):  
Joshua D. Parcel ◽  
John R. Schroeter ◽  
Azzeddine M Azzam

AbstractCurrent trends in the structure of hog production in the U.S. are toward facilities that are not only larger, but also more likely to be specialized, carrying out only some of the vertically linked phases of production in the same facility. This paper investigates the cost efficiency incentives for these changes by estimating a multistage cost function for hog production. Data are from the Hog Production Practices and Costs portion of the USDA’s 2004 Agricultural Resource Management Survey.


2011 ◽  
Vol 5 (2) ◽  
pp. 123 ◽  
Author(s):  
C. Ykman-Couvreur ◽  
P. Avasare ◽  
G. Mariani ◽  
G. Palermo ◽  
C. Silvano ◽  
...  

2017 ◽  
Vol 8 (4) ◽  
pp. 2022-2031 ◽  
Author(s):  
Wan Nur Suryani Firuz Wan Ariffin ◽  
Xinruo Zhang ◽  
Mohammad Reza Nakhai

Sign in / Sign up

Export Citation Format

Share Document