Surface Settlement and Influence on Xi’an City Wall due to Xi’an Subway Line 2 Tunnel Construction

2011 ◽  
Vol 374-377 ◽  
pp. 2326-2332
Author(s):  
Jun Lian Li ◽  
Jian Guo Zheng ◽  
Yang Ping Yao

This paper refers the case project of the Xi'an Subway Line 2 tunneling through the South Gate area of the Xi'an City Wall, has researched the surface settlement due to tunnel construction, and simulated the whole shield tunnel by using Flac3D numerical analysis. This paper has obtained the law of surface settlement and the influence on the City Wall in the tunnel construction by analyzing the calculation results, and simulated the effects of three protective measures which will be used in the South Gate area. The results showed that the surface settlement ratio after the piles and chemical grouting reinforcement was lower by about 25% than no reinforcement. The monitoring data showed that the result of model calculation was reasonable, and the protective measures in Condition 3 are feasible and effective.

2010 ◽  
Vol 168-170 ◽  
pp. 357-364
Author(s):  
Ji Feng Liu ◽  
Bo Liu ◽  
Hui Zhi Zhang

to evaluate the influence of soil-water coupled and shield tunnel construction induced around soil disturbance damage on ground surface settlement, the process of shield tunnel construction induced around soil disturbance is analyzed, the FLAC3D numerical simulation are carried out, and a newly-modified tunnelling-induced ground settlement calculation method based on disturbance degree of around soil and soil-water coupled is presented, and these methods are applied in case of Beijing Metro 10thLine. It is indicated that considering the influence of the shield tunnelling-induced around soil disturbance damage, and soil-water coupled induced soil properties weakening and the excess pore water pressure dissipating induced soil consolidation to the ground surface settlement are necessary, the calculating result of the newly-modified surface settlement prediction method, and the result FLAC3D numerical simulation all agree well with in-site observed data of Beijing Metro 10th Line.


2018 ◽  
Vol 2018 ◽  
pp. 1-10 ◽  
Author(s):  
Changsheng Wu ◽  
Zhiduo Zhu

The tail void grouting is a key step in shield tunnel construction and has an important influence on the loading on the surrounding soil and on the resulting settlement. In order to estimate the ground surface settlement caused by tail void grouting pressure in tunnel construction, the loading on the surrounding soil is simplified as an expansion problem of the cylindrical cavity in semi-infinite elastic space. A simple analytical formula is deduced by using the virtual image technique and Fourier transform solutions. The effectiveness of the proposed method is verified by case studies. The effects of elastic modulus, tail void grouting pressure, tunnel radius, and tunnel depth on the ground surface heave are conducted. The results indicate that the computed results are in accordance with Ye’s solution and it is more rational to consider the ground surface heave induced by tail void grouting pressure in the prediction of ground settlement due to shield excavation. Moreover, the ground surface heave owing to tail void grouting pressure resembled a Gaussian distributed curve. Thus, no matter the ground surface subsidence or ground surface heave can be predicted by means of adding the presented empirical formula to the Peck formula which cannot predict the ground surface heave. The ground surface heave decreases with an increase in elastic modulus. On the contrary, as the tail void grouting pressure and tunnel radius increase, the ground surface heave increases, respectively. The ground surface heave first steadily increases and then declines gradually with the tunnel depth increase.


2021 ◽  
Vol 276 ◽  
pp. 02003
Author(s):  
Yilei Zhang ◽  
Jianxun Ma ◽  
Dan Cheng ◽  
Wenxiao Li

Shield construction has the advantages of stable driving speed, saving manpower, and being able to carry out construction in complex strata, which has been more and more widely used. In the process of shield construction, there is a gap between shield body and segment, which is easy to cause ground settlement when the grouting speed cannot keep up. This paper summarizes the common methods to predict the surface settlement, analyzes the causes of the settlement, and lists an engineering case to illustrate the factors affecting the surface settlement. Finally, it comes to the conclusion that the main causes of the surface settlement caused by shield tunnel construction are formation loss and consolidation settlement, and the use of small cutterhead and composite cutterhead can reduce the surface settlement, It provides a reference for the development of shield construction.


2021 ◽  
Vol 276 ◽  
pp. 01004
Author(s):  
Lu-qiang Peng ◽  
Shi-hai Chen

Based on the Yingxiongshan tunnel project in Jinan, a numerical calculation model of tunnel excavation considering the surface grouting reinforcement effect of soil-rock composite stratum is established, and the effects of elastic modulus and grouting width of grouting reinforcement zone on tunnel stability are studied. and the research results are applied to the supporting project to verify the rationality of the numerical calculation results. The results show that grouting reinforcement can effectively control the deformation of surrounding rock and supporting structure, and the absolute value of surface settlement is negatively correlated with grouting width and elastic modulus. The surface settlement value is not sensitive to the change of the width of grouting reinforcement zone, but is sensitive to the change of elastic modulus.


2011 ◽  
Vol 71-78 ◽  
pp. 32-36 ◽  
Author(s):  
Xin Jiang Wei ◽  
Jie Hong ◽  
Gang Wei

Considering the interaction of building-soil-tunnel, the grillage beams foundation frame building vertical crossed by Double-O-Tube (DOT) shield tunnel was simulated by 3D MIDAS/ GTS software, and the impact of construction on the building was analyzed. The results show that: the ground settlement trough caused by DOT shield tunnel can be fitted by peck formula; during the passage of the shield tunneling through the building, the settlement of the building increased and settlement trough was wilder; the settlement was stable and had a little rebound when shield machine already passed the building; with the increase of driving distance, the first principal stress P1 increased and then was stable; with the increase of L, the shape of foundation settlement curve changed, and the maximum differential settlement between columns increased but was small.


Sign in / Sign up

Export Citation Format

Share Document