Evaluation Index System Construction of Coordination of Road Passenger Terminal Layout and Urban Development

ICTE 2013 ◽  
2013 ◽  
Author(s):  
Wei Zhong ◽  
Zhicai Juan
2014 ◽  
Vol 962-965 ◽  
pp. 2133-2136 ◽  
Author(s):  
Lin Ji ◽  
Ming Xin Cui

The article reviews systematically the domestic and international environment performance audit evaluation index system, and explores the problems existing in the present evaluation system: Application areas are more concentrated on the main micro enterprises; There is a lack of performance evaluation of macro field; Evaluation index is not concrete. And then the article constructs our country environment performance audit evaluation index system.


Sign in / Sign up

Export Citation Format

Share Document