Multifactor Coupling Risk Assessment of High-Speed Railway Dispatching System

ICTE 2013 ◽  
2013 ◽  
Author(s):  
Xinzhu Zhang ◽  
Liping Feng
2021 ◽  
Vol 27 (4) ◽  
pp. 04021030
Author(s):  
Xiaohui Wang ◽  
Jianwei Yang ◽  
Jinhai Wang ◽  
Yanxue Wang ◽  
Fu Liu

1995 ◽  
Vol 11 (6) ◽  
pp. 445-455 ◽  
Author(s):  
C. L. Leighton ◽  
C. R. Dennis

Author(s):  
Xin Dai ◽  
Qingsheng Liu ◽  
Chong Huang ◽  
He Li

As a highly important meteorological hazard, heat waves notably impact human health and socioeconomics, and accurate heat wave risk identification and assessment are effective ways to address this issue. The current spatial scale of heat wave risk assessment is relatively coarse, hardly meeting fine-scale heat wave risk assessment requirements. Therefore, based on multi-source fine-scale remote sensing data and socioeconomic data, this paper evaluates the heat wave risk along the Jakarta-Bandung high-speed railway, obtains the spatial distribution of heat wave risk in 2005, 2014 and 2019, and analyzes spatiotemporal risk variations over the past 15 years. The results show that most high-risk areas were affected by high-temperature hazards. Over time, the hazard, exposure, vulnerability and risk levels increased by 25.82%, 3.31%, 14.82% and 6.97%, respectively, from 2005–2019. Spatially, the higher risk in the northwest is mainly distributed in Jakarta. Additionally, a comparative analysis was conducted on the risk results, and the results showed that the 100-m scale showed more spatial differences than the kilometer scale. The research results in this paper can provide scientific advice on heat wave risk prevention considering the Jakarta-Bandung high-speed railway construction and regional economic and social development.


2020 ◽  
Vol 45 ◽  
pp. 384-393 ◽  
Author(s):  
Andrea Simone ◽  
Claudio Lantieri ◽  
Valeria Vignali ◽  
Francesco Mazzotta ◽  
Michele Carpinone ◽  
...  

2013 ◽  
Vol 405-408 ◽  
pp. 1305-1308
Author(s):  
Xing Kuang ◽  
Di Qing Yi ◽  
Cheng Liang Wang

High speed railway tunnel have many uncertainty hazard factors in construction, at the stage of construction drawing design and during tunnel construction process. Taking no.1 tunnel in Xuefeng Mountain as a deep buried tunnel in the paper, tunnel construction risk source and main risk identification are analysis, main risk assessment during construction is recognized and reference for other similar projects is provided.


Sign in / Sign up

Export Citation Format

Share Document