Hybrid spider monkey optimisation algorithm for multi-level planning and scheduling problems of assembly lines

2019 ◽  
Vol 58 (20) ◽  
pp. 6252-6267 ◽  
Author(s):  
Jabir Mumtaz ◽  
Zailin Guan ◽  
Lei Yue ◽  
Li Zhang ◽  
Cong He
IEEE Access ◽  
2019 ◽  
Vol 7 ◽  
pp. 18685-18700 ◽  
Author(s):  
Jabir Mumtaz ◽  
Zailin Guan ◽  
Lei Yue ◽  
Zhengya Wang ◽  
Saif Ullah ◽  
...  

2010 ◽  
Vol 25 (3) ◽  
pp. 319-336 ◽  
Author(s):  
Gérard Verfaillie ◽  
Cédric Pralet ◽  
Michel Lemaître

AbstractThe CNT framework (Constraint Network on Timelines) has been designed to model discrete event dynamic systems and the properties one knows, one wants to verify, or one wants to enforce on them. In this article, after a reminder about the CNT framework, we show its modeling power and its ability to support various modeling styles, coming from the planning, scheduling, and constraint programming communities. We do that by producing and comparing various models of two mission management problems in the aerospace domain: management of a team of unmanned air vehicles and of an Earth observing satellite.


Author(s):  
Ajay Sharma ◽  
Harish Sharma ◽  
Annapurna Bhargava ◽  
Nirmala Sharma ◽  
Jagdish Chand Bansal

Sign in / Sign up

Export Citation Format

Share Document