Beyond The Fringe: Social and Physical Planning Problems in Shires Adjacent to Melbourne's Metropolitan Statistical Division

1993 ◽  
Vol 11 (2) ◽  
pp. 81-95 ◽  
Author(s):  
John T. Jackson ◽  
Kevin O'Connor

A non-standard approach to solving the activation planning problems of the standardized products in a multinomenclature workshop is considered. This approach is caused by writing control programs and developing new information systems without changing previously developed workstations, which were created by using an outdated programming languages, in particular Clipper applications. The concept of creating a single information space — a set of databases and software tools integrated at the software level is proposed. Keywords standardized product; normal; software; web interface; single window; automatic work place; production task; shift task; order-shift report; control and registration card


1981 ◽  
Vol 11 (4) ◽  
pp. 315-323 ◽  
Author(s):  
Mike Moore ◽  
Woodrow Jones

1944 ◽  
Vol 16 (1) ◽  
pp. 84 ◽  
Author(s):  
Ernst Fuchs
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document