Knowledge-based system for selection of an AGV and a workcentre for transport of a part in on-line scheduling of FMS
1997 ◽
Vol 8
(2)
◽
pp. 114-122
◽
Optimum selection of grinding parameters using process modelling and knowledge based system approach
1991 ◽
Vol 28
(1-2)
◽
pp. 189-198
◽
Keyword(s):
1991 ◽
Vol 2
(4)
◽
pp. 199-211
◽
1999 ◽
Vol 45
(3)
◽
pp. 246-247
◽
2002 ◽
Vol 23
(8)
◽
pp. 701-708
◽
1992 ◽
Vol 12
(9)
◽
pp. 39-48
◽
Keyword(s):
1990 ◽
Vol 27
(1)
◽
pp. 47-48
1992 ◽
Vol 17
(2)
◽
pp. 193-200
◽