Risk assessment for clearing and grading process of a natural gas pipeline project: An extended TOPSIS model with Pythagorean fuzzy sets for prioritizing hazards

2018 ◽  
Vol 25 (6) ◽  
pp. 1615-1632 ◽  
Author(s):  
Nurdan Ece Oz ◽  
Suleyman Mete ◽  
Faruk Serin ◽  
Muhammet Gul
Geosciences ◽  
2019 ◽  
Vol 9 (2) ◽  
pp. 61 ◽  
Author(s):  
Vassilis Marinos ◽  
Georgios Stoumpos ◽  
Costas Papazachos

The paper focuses on the assessment of landslide hazard and risk along or across the Trans Adriatic Pipeline (TAP) natural gas pipeline project in Albania. TAP is a natural gas pipeline that will transport gas from the Caspian Sea to Europe, crossing Northern Greece and Southern Albania. It has long been recognised that landsliding is a major factor for TAP’s pipeline route selection in mountainous regions, especially the challenging area of central Albania. Experience from similar major pipelines has shown that hazard avoidance is generally the most cost- and time-efficient strategy to minimise the landslide risk since geohazard-related decision-making is usually risk-based. For landslides, the risk profile is expected to be dominated by the upslope expansion of existing landslides, resulting in a loss of ridge crest (where the Right of Way (RoW) is usually located), possibly leading to pipeline rupture. However, it is still possible that new landslides could develop under static and/or seismic conditions, especially on steep ridge flanks along the route. An expert determination approach was adopted to define a consensus for the estimate of the risk (i.e., chance of rupture) for the pipeline at eighty-two (82) identified landslide sites in Albania, to identify “hot spots” along the route, where risk-reduction measures could be prioritised. Ten landslides were characterised as “High Risk”, fifteen as “Medium Risk” and nineteen as “Low Risk”. Following this risk assessment, two large re-routings, as well as several local re-routings, were considered. Further investigation was required to identify the site-specific geotechnical conditions and probable remedial measures in cases where landslides could not be avoided by rerouting.


Author(s):  
Sandeep Vyas

Reliance Gas Pipelines Limited (RGPL) is currently implementing a gas pipeline project from Shahdol, Madhya Pradesh to Phulpur, Uttar Pradesh for evacuation of gas produced from Coal Bed Methane (CBM) blocks owned by Reliance Industries Ltd. This pipeline will be hooked up with GAIL’s HVJ Pipeline at Phulpur. Over all Pipeline system includes 312 km (approx.) long trunk line, and associated facilities such as Compressor Station at Shahdol, Intermediate Pigging facilities, Metering & Regulating facilities at Phulpur and 12 No. Mainline valve stations. Gas produced from CBM blocks will be dehydrated within Gas Gathering Station facilities of CBM Project located upstream of pipeline Compressor station at Shahdol. Gas received at pipeline battery limit is dry and non-corrosive gas in nature, Internal corrosion is not expected in normal course of operation, however internal corrosion of the natural gas pipeline can occur when the pipe wall is exposed to moisture and other contaminants either under process upset conditions or under particular operating conditions. Even though internal corrosion is not expected during normal course of operations, to take care of any eventuality, it is proposed to implement Internal Corrosion Monitoring (ICMS) system in this project. ICMS will provide an efficient and reliable means of continuous monitoring internal corrosion. Internal Corrosion Monitoring (ICMS) system is used as a part of overall integrity management framework; to achieve two objectives viz., verify the corrosive behaviour of gas and to verify the efficacy of applied preventive actions. Philosophy involved in evaluating a suitable CM technique would include : • Applicable corrosion damage mechanisms, anticipated corrosion rates and probable locations. • Suitable CM technique and location based on process condition, system corrosivity, water content, pigging facilities, available corrosion allowance, design life, maintenance etc., • Measurement frequency. Some of the Corrosion Monitoring techniques used for pipeline and of relevance are: • Weight-loss Corrosion Coupons (CC), • Electrical Resistance probes (ER), • Linear Polarization Resistance Probe (LPR) • Ultrasonic Thickness Measurement (UT) • Sampling Points (SP) This paper discusses the merits / demerits of these corrosion monitoring techniques, considerations for selecting a specific technique for the Shahdol – Phulpur Gas Pipeline Project and highlights the implementation of the internal corrosion monitoring system.