scholarly journals Interior Decoration Design and Construction Technology of Hardcover Room

2020 ◽  
Vol 1649 ◽  
pp. 012005
Author(s):  
Jing He
2011 ◽  
Vol 480-481 ◽  
pp. 1266-1270
Author(s):  
Liu Hui

During the pipe jacking construction, the bearing plates of jack need the support of great reactive force which is provided by the side-wall of the working shaft and the soil mass behind the wall. In the shallow pipe-jacking working shaft, the soil mass only can provide limited reactive force due to the small height of the soil mass behind the side-wall, which becomes the difficult point in the design and construction of the shallow pipe-jacking working shaft. This thesis takes the actual projects for the examples to introduce the construction technology of shallow pipe-jacking working shaft in details, including the construction key points like pre-grouting injection consolidation, ring beam construction method as well as reverse construction method.


2020 ◽  
Vol 2020 ◽  
pp. 1-20 ◽  
Author(s):  
Tong Liu ◽  
Yujian Zhong ◽  
Zhihua Feng ◽  
Wei Xu ◽  
Feiting Song ◽  
...  

As a typical granular bulk medium, problems are common in boulder-cobble mixed grounds, such as easy collapse and instability and difficult effective support for large-section tunnel excavation. Tunnels constructed in BCM grounds are rare still, and there is a big gap between the design and construction of tunnels. Based on the Nianggaicun highway tunnel crossing the BCM grounds, the construction technology of tunnel in BCM grounds is studied by means of literature investigation and field survey. Here are the main conclusions: the overall deformation of surrounding rock is quite small; the pressure distribution of surrounding rock is small and loose pressure is dominant, and the safety reserve of secondary lining is large. The deformation process of surrounding rock concentrates on the construction stage. During the construction process, there are many problems, such as serious overexcavation, difficulty of bolt penetration, and continuous rock fall. In this paper, a three-bench complementary cyclic excavation method is proposed, which replaces the original CD and CRD methods. Meanwhile, the supporting system is optimized. The results show that the disturbance of surrounding rock is reduced, while the safety of construction process and the reliability of structure are increased. The new excavation method and optimized supporting system are expected to fill the gap between design and construction of tunnel in BCM grounds and provide reference for construction of such tunnels in the future.


2014 ◽  
Vol 578-579 ◽  
pp. 121-126
Author(s):  
Ji Dong Li ◽  
Lian Jin Tao ◽  
Jun Hai An ◽  
Bin Lin Wu

It is great significance for the design and construction of similar beneath engineering to study the multiple pre-top bracing technology in the subway close-attached undercrossing engineering. In this paper,taking the Beijing 10-line New Gongzhufen station close-attached undercrossing the existing Subway Line 1 Station as background, explored the application of multiple pre-top bracing construction technology, and designed a new kind of top bracing platform system, studied the application of multiple pre-top bracing construction technology in the large span of close-attached undercrossing engineering.


Sign in / Sign up

Export Citation Format

Share Document