Study on Mix Proportion Design and Construction Technology of Warm Mix Asphalt Mixture

2021 ◽  
Vol 11 (09) ◽  
pp. 1052-1059
Author(s):  
繁文 殷
2013 ◽  
Vol 361-363 ◽  
pp. 1477-1483 ◽  
Author(s):  
Hong Zhao ◽  
Xiu Shan Wang ◽  
He Quan Lu ◽  
Xiao Ling Lu

As a new material, the warm mix asphalt retardant asphalt mixture has its particularity in material design, construction proportion, mixture preparation and on-site paving. This paper summarized the construction process and site construction quality inspection requirement of the warm mix asphalt retardant asphalt mixture through tracking research on-site based on the real engineering. It was shown that the road environment quality of using warm mix retardant asphalt was significantly better than normal hot mix asphalt, asphalt smoke, benzene soluble and Benzopyrene decreased 91.47%, 97.05% and 80.11% respectively. Warm mix asphalt retardant asphalt mixture had a low mixing and compaction temperature. When used in the tunnel pavement, it could not only greatly reduce harmful gas emissions in the process of construction, improve construction environment in tunnel, improve the air transparency in tunnel, be convenient for construction quality management, but also can improve the fire resilience of the tunnel pavement after be put into operation. It had broad application prospect in the tunnel pavement.


2012 ◽  
Vol 256-259 ◽  
pp. 1748-1753
Author(s):  
Bin Zhao ◽  
Pei Wen Hao

As vehicle flow on arterial highway in Inner Mongolia sharply increased, the originally designed natural increase rate of 8% per year has been exceeded on the vehicle flow in some sections. According to statistics, monthly average vehicle flow on major section of G6 expressway has reached a standard flow of 67478 vehicles per day and night, of which in 70-80% are large ones for coal transportation. Therefore, pavement load and road capacity have exceed the designed expressway load capacity. At present, semi-rigid base asphalt pavement structure is still widely used for high-grade highway pavement in Inner Mongolia. With years of construction for such pavement structure, a great deal of valuable experience has been gained on construction technology. However, there are still a few deficiencies in the quality of raw materials, gradation control of asphalt mixture and adjustment of equipment, etc. Hohhot circle expressway connects with the G6 and G7 expressways, suffering from problems such as large vehicle flow and load overweight. This paper introduced a key technique that should be properly controlled during construction of such pavement structure, emphasized technique control and management of the following aspects, i.e. ballast sizes and gradation control, asphalt concrete mixture, adjustment of pavers, validation of mixing proportion in production and reasonable arrangement of process, and summarized corresponding technical measures taken during construction of asphalt pavement in this project.


2011 ◽  
Vol 480-481 ◽  
pp. 1266-1270
Author(s):  
Liu Hui

During the pipe jacking construction, the bearing plates of jack need the support of great reactive force which is provided by the side-wall of the working shaft and the soil mass behind the wall. In the shallow pipe-jacking working shaft, the soil mass only can provide limited reactive force due to the small height of the soil mass behind the side-wall, which becomes the difficult point in the design and construction of the shallow pipe-jacking working shaft. This thesis takes the actual projects for the examples to introduce the construction technology of shallow pipe-jacking working shaft in details, including the construction key points like pre-grouting injection consolidation, ring beam construction method as well as reverse construction method.


2020 ◽  
Vol 2020 ◽  
pp. 1-20 ◽  
Author(s):  
Tong Liu ◽  
Yujian Zhong ◽  
Zhihua Feng ◽  
Wei Xu ◽  
Feiting Song ◽  
...  

As a typical granular bulk medium, problems are common in boulder-cobble mixed grounds, such as easy collapse and instability and difficult effective support for large-section tunnel excavation. Tunnels constructed in BCM grounds are rare still, and there is a big gap between the design and construction of tunnels. Based on the Nianggaicun highway tunnel crossing the BCM grounds, the construction technology of tunnel in BCM grounds is studied by means of literature investigation and field survey. Here are the main conclusions: the overall deformation of surrounding rock is quite small; the pressure distribution of surrounding rock is small and loose pressure is dominant, and the safety reserve of secondary lining is large. The deformation process of surrounding rock concentrates on the construction stage. During the construction process, there are many problems, such as serious overexcavation, difficulty of bolt penetration, and continuous rock fall. In this paper, a three-bench complementary cyclic excavation method is proposed, which replaces the original CD and CRD methods. Meanwhile, the supporting system is optimized. The results show that the disturbance of surrounding rock is reduced, while the safety of construction process and the reliability of structure are increased. The new excavation method and optimized supporting system are expected to fill the gap between design and construction of tunnel in BCM grounds and provide reference for construction of such tunnels in the future.


2013 ◽  
Vol 712-715 ◽  
pp. 858-864
Author(s):  
Yong Hong Wang ◽  
Xi Ming Tan ◽  
Xiong Jun He ◽  
Li Wu ◽  
Bo Dong ◽  
...  

The temperature has been reduced in the aggregate heating, mixing, transportation and paving for Warm mix asphalt mixture (WMA),but the temperature of hot mix mixes has no diversification. So the mixing ratio of warm mix asphalt mixed material cannot be completely designed to the HMA and it should be designed by the mixing ratio of WMA. Through analyzing the relationship of aggregate moisture content and getting the performance of the allowed moisture . Combining with the principle of conservation of energy and laboratory to get the conclusion of the aggregate heating time and heating temperature, in order to calculate the construction control parameters, and it will promote the application of asphalt pavement in the construction.


Sign in / Sign up

Export Citation Format

Share Document