Constructing Input-Output (I-O) models from less than perfect datasets: an economic impact analysis of garage construction project in Gresik, East Java Province, Indonesia
2019 ◽
Vol 340
◽
pp. 012003
Keyword(s):
2014 ◽
Vol 11
◽
pp. 585-593
◽
Keyword(s):
2014 ◽
Vol 17
(4)
◽
pp. 379-395
◽
2020 ◽
Vol 30
(4)
◽
pp. 25-36
Keyword(s):
Keyword(s):
Keyword(s):
2019 ◽
Vol 31
(10)
◽
pp. 433-454
Keyword(s):
2019 ◽
Vol 32
(6)
◽
pp. 2231-2248
Keyword(s):
2018 ◽
Vol 26
(3)
◽
pp. 233-265