scholarly journals Analysis of Sunshine Temperature Field and Temperature Effect of Prestressed Concrete Beam Bridge

Author(s):  
Liuyu Zhang ◽  
Shufa He ◽  
Guitong Zhang ◽  
Jingwen Zhou ◽  
Lezhou Huang ◽  
...  
2014 ◽  
Vol 496-500 ◽  
pp. 2501-2504
Author(s):  
Xi Jun Yin

Prestressed concrete beam bridge cross-section using T-shaped cross-section. Anti-shrinkage reinforcement requirements adopted under the dense arrangement of all the memorial steel welds are double-sided welding, using a special form of prestressed reinforcement arranged in assembly is completed, tension on the deck to prevent the beam edge cracking.


2011 ◽  
Vol 255-260 ◽  
pp. 1017-1022
Author(s):  
Feng Chen ◽  
Da Lin Hu ◽  
Yi Li Sun

The shear bearing capacity of pretensioning prestressed concrete beam bridge mainly depends on the stirrup and concrete of the beam, but the longitudinal pre-pressure plays a certain role for the shear bearing of the structure. Under the carbonization corrosion condition, the shear-bearing capacity of the pretensioning prestressed concrete beam will attenuate gradually with the stirrup corrosion and concrete deteriorate. And the risk of brittle shear failure will be increased with the enhanced reinforcement corrosion amount. The paper presents an anti-shear calculation model of the pretensioning prestressed concrete beam bridge, and discusses the time-variation model of the corrosion stirrup considering the effective prestress attenuation under the carbonization corrosion condition. The analysis method on the anti-shear reliability of existing pretensioning bridges under the corrosion condition is proposed then. The method will be used in the durability and safety evaluation of the shear-bearing capacity of the existing pretensioning prestressed concrete bridges.


Sign in / Sign up

Export Citation Format

Share Document