scholarly journals Achieving the Benefits and Requirements of Integrated Project Delivery Method Using BIM

Author(s):  
Mahdi S. Salim ◽  
Ahmed Mohammed Raoof Mahjoob
2017 ◽  
Vol 9 (5) ◽  
pp. 536-540
Author(s):  
Justas Aukštikalnis ◽  
Darius Migilinskas

More and more project development companies in the world and Lithuania are trying to create higher quality projects, more accurate calculations, save time and do not exceed budget of the construction. Using IPD (Integrated Project Delivery) and BIM (Building Information Modeling) methods together projects delivery processes become faster and better quality. All of this allows efficient delivery of the projects and also to save time, project budget, because during construction period to correct mistakes and to make new decisions costs a lot and most importantly it has a direct impact on project deadlines. Therefore, this article will be about traditional projects and integrated project delivery methodology, where real projects will be analyzed in both methods. At the end the evaluation of twelve projects implementation for further investor decision.


2018 ◽  
Vol 86 ◽  
pp. 199-209 ◽  
Author(s):  
Zhiliang Ma ◽  
Dongdong Zhang ◽  
Jiulin Li

2014 ◽  
Vol 2014 ◽  
pp. 1-8 ◽  
Author(s):  
Xiang Ding ◽  
Zhaohan Sheng ◽  
Jianguo Du ◽  
Qian Li

Project delivery planning is a key stage used by the project owner (or project investor) for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.