Research on enterprise project management capability evaluation index system

Author(s):  
Xin-hua Wu ◽  
Hong-jun Jia
2012 ◽  
Vol 268-270 ◽  
pp. 2075-2082
Author(s):  
Da Qi Xu ◽  
Tian Hai Hua

Combinating the process theory and system theory organically, this paper views enterprise’s technological innovation as a continuously improved system process. It builds a system model for the evaluation of technological innovation capability based on the view of process. Considering the features of cement industry, the technological innovation capabilities in cement industry are divided into innovation management capability, innovation input capability, research & development capability, manufacturing capability, marketing promotion capability and innovation output capability. And we propose a comprehensive and complete evaluation index system of cement industry’s technological innovation capability and provide a ruler for the evaluation of cement industry’s technological innovation capability


2011 ◽  
Vol 368-373 ◽  
pp. 3098-3101
Author(s):  
Ya Ning Wang

Based on the theory of enterprise project management maturity, this paper analyzes the influence factors of real estate enterprise project management maturity and put forward the evaluation index system considering the characteristics of real estate project management. AHP model for project management maturity of real estate enterprise is established, which gives the method and steps of project management maturity evaluation. The model provides a powerful tool of developing project management ability for real estate enterprise.


2014 ◽  
Vol 584-586 ◽  
pp. 2233-2238
Author(s):  
Shen Jun Qi ◽  
Wei Chen ◽  
Yun Bo Zhang ◽  
Jing Jing Wu ◽  
Jia Zhong Cai

<p class="p19">Based on Project Management Office (PMO) and Organizational Project Management Maturity Model (OPM3), 36 influence factors were firstly identified, which were extracted from organization structure framework and objective requirement of multi-project management in the mega construction engineering enterprise. These influence factors were reflected in the organizational support, informatization construction, and project management. The maturity evaluation index system was built and optimized by Principal Component Analysis (PCA) on the basis of questionnaire survey on the 238 national excellent project manager and high-level business executives. Consequently, 8 main factors were assessed quantitatively. The results show that the most important factor is contract management and coordination of strategy level, and the least important factor is market ability. The enterprise should pay more attention to organization construction, application of the tools and methods of multi-project management, enterprise culture and integration ability of multiple projects.</p>


Sign in / Sign up

Export Citation Format

Share Document