A simplified construction model for system safety analysis and quantified risk assessment: A case study of vehicle leaved road

Author(s):  
W. H. Wang ◽  
X. Jiang ◽  
X. Ren ◽  
H. Tan ◽  
Q. Cao
Proceedings ◽  
2020 ◽  
Vol 63 (1) ◽  
pp. 21
Author(s):  
Mariana Dumitrescu

For a specific vessel, the safety of the isolated power system is analyzed. Concerning the safety, the choice of propulsion system and the classification regulations have a major role for the power system design. The rules of SOLAS (International Convention for the Safety of Life at Sea), the flag state, and the harbor authorities are pointing to the basic level of safety, while the classification societies are pointing to the basic navigational regulations. A case study of the main switchboard and emergency switchboard safety, while taking into account different short circuits for the specific operational configuration of the electrical network, makes a comparative study possible.


2017 ◽  
Vol 80 ◽  
pp. 133-141 ◽  
Author(s):  
Mina Aghaei ◽  
Ramin Nabizade ◽  
Simin Nasseri ◽  
Kazem Naddafi ◽  
Amir Hossein Mahvi ◽  
...  

2018 ◽  
Author(s):  
Michael H. Azarian

Abstract As counterfeiting techniques and processes grow in sophistication, the methods needed to detect these parts must keep pace. This has the unfortunate effect of raising the costs associated with managing this risk. In order to ensure that the resources devoted to counterfeit detection are commensurate with the potential effects and likelihood of counterfeit part usage in a particular application, a risk based methodology has been adopted for testing of electrical, electronic, and electromechanical (EEE) parts by the SAE AS6171 set of standards. This paper provides an overview of the risk assessment methodology employed within AS6171 to determine the testing that should be utilized to manage the risk associated with the use of a part. A scenario is constructed as a case study to illustrate how multiple solutions exist to address the risk for a particular situation, and the choice of any specific test plan can be made on the basis of practical considerations, such as cost, time, or the availability of particular test equipment.


2000 ◽  
Vol 14 (5) ◽  
pp. 1264-1270 ◽  
Author(s):  
Elisabeth Slooten ◽  
David Fletcher ◽  
Barbara L. Taylor
Keyword(s):  

2020 ◽  
Vol 34 (5) ◽  
pp. 627-640 ◽  
Author(s):  
Shi Xianwu ◽  
Qiu Jufei ◽  
Chen Bingrui ◽  
Zhang Xiaojie ◽  
Guo Haoshuang ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document