Study on inspection and adjustment of engineering construction project schedule plan

Author(s):  
Hong Lv ◽  
Long-han Zhang
2013 ◽  
Vol 380-384 ◽  
pp. 4604-4608
Author(s):  
Hong Lv ◽  
Long Han Zhang ◽  
Shi Wei Xu

Project schedule control is one of the important control goals in project management. It is an important measure to ensure that the project is completed safely, reasonable arrangements for the resources supply and saving cost. Any of the projects must be by means of scientific planning and control methods in order to achieve the desired goals. Deviation analysis is an ongoing work in the progress of project, how to determine the deviation of project timely and accurately, the method that used is crucial. This paper chose a highway construction project as research object, using the Inspection Acts include Gantt chart, S-shaped curve and Banana-shaped curve of schedule, and made the comparative analysis for project to identify deviations and take measures to adjust in order to ensure the project is completed on schedule.


2021 ◽  
Vol 276 ◽  
pp. 02026
Author(s):  
Houjie Qiu

With the rapid development of information technology, unmanned aerial vehicle (UAV), as a new and popular technology, has also been tried in the field of engineering construction. In this paper, through the application of UAV technology in Australia's large-scale project to extinguish mountain fire, the application effect of UAV in the whole life cycle of engineering construction project is analogized. UAV assisted project progress, management quality and safety and other aspects, so that managers can timely and efficiently understand the situation of the project site, and effectively improve the management's control over the project construction, indicating the future application prospect of UAV technology in the construction field.


Sign in / Sign up

Export Citation Format

Share Document